2026 pilot programmeFor practices, engineers and local authorities →

How to organise a project application before you submit it

A well-organised application prevents a missing document, an invalid signature or two figures that disagree. The council’s own list is the one that counts. Documents are sorted by when they go in: with the application, before work starts or at completion. Before signing, the same figure has to read the same in every document.

Art. 299.2Other authorities’ approvals come before the permit. A permit cannot be conditional on obtaining them later.LISTA Regulations
In this article
  1. The short version
  2. Three lists: the nearest one wins
  3. Organise by stage, not by subject
  4. A structure that makes sense without opening anything
  5. Signature, certification and format
  6. What expires and what depends on others
  7. The last pass: everything says the same
  8. Where Archelo helps
  9. Frequently asked questions

The short version

This guide draws on Spain’s building code, the Building Act, Act 39/2015 on administrative procedure and the regulations under Andalusia’s planning act. For the local level it follows a planning permit bylaw approved in September 2025, because its annex sorts each document by stage. Your town will have another list, though the method holds.

Three lists: the nearest one wins

An application answers to three levels of rules at once. Each one adds to the last:

LevelWhat it setsWhere
NationalWhat a project contains, “without prejudice” to what the competent authorities require. Partial projects are integrated as separate documents under the lead designer’s coordination.Part I, art. 6.1 and Annex I, Building Act, art. 4.2
Regional (Andalusia)What the application identifies, the technical project, the georeferenced plan and prior authorisations.LISTA Regulations, art. 299
LocalAny further documents and the standard forms, by bylaw.LISTA Regulations, art. 299.3, each town’s bylaw

That gives the first step: download the council’s form and list on the day work on the application begins. If an authority sets a specific form for a procedure, it is mandatory (Act 39/2015, art. 66.6). And bylaws change: the one we follow here dates from late 2025, so a list inherited from an earlier application may already be out of date.

What each document contains is covered in the guides to permit documents and the project report. This one is about how it all fits together.

Organise by stage, not by subject

In Andalusia the basic project is enough to apply for the permit. Work, however, cannot start without the construction project, certified by the professional body where national rules require it (LISTA Regulations, art. 299.1.a). Annex I marks the basic project’s minimum with an asterisk: in the report the parties, prior information, description, performance, foundations and fire safety, plus the general drawings and the approximate estimate.

That bylaw turns this into a table: its article 30 and Annex II.1 split the documents into three stages, each document with its own box.

StageWhat goes in (a selection for works with a project)
Application (“prior to grant”)Form, proof of fee, location plan, proof of representation if any, land registry extract, basic project with its georeferenced plan, sectoral authorisations required.
Effect (“conditional”: before work starts)Construction project, statement that it matches the basic project, health and safety study, site direction and construction management appointment certificates, statistics form and, where relevant, telecoms project or fire separata.
CompletionSelf-declaration of occupation or use with the documents in annexes II.9 and II.10.

A self-declaration changes the split. According to the FAQ on that bylaw, only the form is filed and the listed documents are kept during the works and for at least six years after, available to the planning office on request. With less to hand in, order matters more: it is what gets shown when someone asks. Which works take which route is explained in self-declaration or permit in Andalusia.

A structure that makes sense without opening anything

The rules cited here do not impose file names or a folder order on the applicant. The numbered index in article 70.2 of Act 39/2015 belongs to the file the authority forms when it sends it on. What follows is a working proposal, not a requirement. If your council sets another structure, use that one:

FolderWhat it holdsWhat to check on closing it
00 IndexNumbered list of everything submitted, with version and date.That each line matches a real file.
01 ApplicationForm, fee, representation.That the form is the current one and signed.
02 PropertyLand registry extract, location plan, photographs.The date on the extract.
03 ProjectReport, drawings, specifications, quantities and estimate, by stage.That the report cites the partial projects it integrates (Annex I, point 3).
04 Annexes and studiesCalculations, services, quality control, waste, health and safety.That their version matches the drawings.
05 AuthorisationsReports and authorisations from other authorities.That all those required before the permit are there.
06 ProfessionalsRegistration, standing, insurance, appointment certificates.One for each professional involved.

Within each folder, a name saying what it is and which version is enough, for example 03-02 Drawings v2.pdf. One detail that is easy to miss: among the minimum contents of technical documents, that bylaw also asks for a planning justification annex and a separate annex of sensitive data (art. 10.3). Pieces like this only turn up if you read the bylaw.

Signature, certification and format

These are the easiest problems to avoid, because they have nothing to do with the design:

  • Electronic filing. It is compulsory for those practising a profession that requires registration, for legal entities and for those representing them (Act 39/2015, art. 14.2). If one of them files on paper, they are asked to correct it and the filing date becomes the date of the correction (art. 68.4).
  • Certification comes first. The construction project for building work that needs a project under the Building Act must be certified by the professional body before it is submitted: later certification is not possible (RD 1000/2010, arts. 2.a and 6.2). In other cases it is voluntary (LISTA Regulations, art. 300.1).
  • Electronic signature, not a scan. In the bylaw we follow, anything not needing certification is filed with the professional’s electronic signature and handwritten or scanned signatures are not accepted. It also needs a statement of registration, standing and insurance or the certificates that replace it (Annex II, formal requirements, point 2).
  • What goes with it is certified too. Where certification is compulsory, that bylaw also wants it on the separatas, the health and safety study, the statement of match and the appointment and completion certificates (point 3). And all technical documents go in as PDF (point 4).

Since any later change means signing and possibly certifying again, the signature comes last, once the check below is finished.

What expires and what depends on others

An application can be complete on Monday and stop being so a month later. These pieces are best prepared by counting back from the filing date:

ItemWhat to watchSource
Land registry extractUnder three months old, in the bylaw we follow.Annex II.1
Sectoral reports and authorisations from other authoritiesThey must be in place before the permit. A permit cannot be conditional on obtaining them later.LISTA Regulations, art. 299.2
Documents already filed with an authorityThey need not be filed again: it is enough to state when and with which body.Act 39/2015, art. 28.3

In protected buildings, the heritage authorisation has to be allowed for as well, covered in its own guide. And there is one more reason not to file half an application: under that bylaw, the procedure starts counting when the complete documents reach the register (arts. 9.3 and 31.1).

The last pass: everything says the same

The council’s technical report checks compliance with planning and that all required documents are there (LISTA Regulations, art. 302.1). Before signing, it pays to read the application the same way, one item at a time:

  • Developer: the same on the form and in the report’s parties section. If they are not the owner on the registry extract, the relevant authorisation.
  • Location: address and cadastral reference identical on the application, report, drawings and extract.
  • Works: use, type of work and number of dwellings described the same way on the application, report and drawings.
  • Areas: the report’s schedule agrees with the drawings. The usual mistakes are in the guide to the area schedule.
  • Estimate: the construction cost is the same in the report, estimate and application. The detailed one includes quality control and health and safety (Annex I, V). More in how to review the BC3.
  • Versions: the report and annexes cite the drawings actually being filed.
  • Stage: the construction project does not lower the basic project’s performance or alter the uses and conditions of the permit (Part I, art. 6.1.3.b).
  • Professionals: names and qualifications identical in the report, the certificates and the signatures.

Where Archelo helps

Archelo helps you group the project’s documents into folders, see what is missing from the application and compare report, drawings and estimate: areas, construction cost and descriptions, with the document and page of each difference. More on AI for architects.

Frequently asked questions

Which list of documents counts for an application?

That of the council where it is filed, with its standard forms. It adds to what the building code and regional rules set and it can change, so it is best downloaded on the day work on the application begins.

Is the basic project enough to apply for a permit in Andalusia?

Yes, though work cannot start without the construction project, certified where national rules require it (LISTA Regulations, art. 299.1.a).

Who has to file electronically?

Those practising a profession that requires registration, legal entities and those representing them (Act 39/2015, art. 14.2). If one of them files on paper, the filing date becomes the date of the correction (art. 68.4).

What should be checked before signing?

That the same item reads the same in every document: developer, location, use, areas, construction cost, drawing versions and the names of the professionals.

Keep reading

10 · 3 · 1The years of liability for structure, habitability and finishes, counted from handover.LOE, art. 17.1

The Building Act in a practice: who answers for what and from when

Each party answers for its own part for ten, three or one year depending on the defect. Every period runs from handover, so a badly closed handover record moves the clock and leaves parts uncovered.

Ground floor plus one, seven to twelve dwellings upstairsThe decree requires the lift installed. The building code settles for leaving room for one.

Accessibility in Andalusia: Decree 293/2009 in housing projects

In a residential building, Decree 293/2009 governs communal areas and reserved dwellings, not the inside of the others. It applies alongside DB-SUA. Where the two differ, the stricter one must be met.

Four jobs that must be certified
  • Execution project
  • Final certificate
  • Legalisation
  • Demolition without explosives

Visado: when certification by the professional body is mandatory

Certification by the professional body is voluntary except for a closed list of work. In building, the list includes the execution project and the final certificate. The basic design is not on it and a permit can be applied for with it.

AI for architects: can it check a project against building regulations?

Software can already verify much of what a project has to state, with the article and page of every figure. What it cannot do is decide what your project means. And nothing failing does not mean it complies.

€450,759.08The contract price, with VAT, from which the study must be the full one.RD 1627/1997, art. 4.1

The basic health and safety study (RD 1627/1997): when it is enough and what it contains

Every project-based job carries a health and safety study, full or basic. Four conditions decide which. The cost threshold is measured on the contract budget with VAT, not on the material execution budget.

Seven minimum contents
  • Estimate and prevention
  • Destination and separation
  • Drawings and specifications
  • Cost

The construction waste management study (RD 105/2008): what it must include

RD 105/2008 requires the waste management study and the designer writes it. It has seven minimum contents and five of them already go in the basic design. A refurbishment adds an inventory of hazardous waste.

1.50 mThe height that most often makes usable area differ from one document to another.

The usable and gross floor area schedule: the most common mistakes

The usable area in a valuation, the one on the energy certificate and the cadastre’s gross area are not measured the same way. Countable area is set by each municipality. That is why a schedule has to say which criterion it uses.

ChatGPT for architects: what it is good for, where it fails with regulations and how to check it

ChatGPT and the other general assistants draft, summarise and explain well. They are not a source of regulations: use them for the former and never accept a requirement without opening the official text.

Documents for a building permit application in Spain: the complete file, in order and reviewed

A permit application with a project brings together five groups of documents. Each council publishes its own list, though the core is common across Spain. Before submitting, the most useful check is that they all say the same.

Art. 138What goes by self-declaration in Andalusia. Everything else needs a permit.LISTA

Self-declaration or building permit in Andalusia: when each applies

In Andalusia the permit is the rule and the self-declaration the exception listed in article 138 of the LISTA. Needing a project does not mean needing a permit: a refurbishment with a project on urban land can go by self-declaration if it leaves occupancy, height, buildable area and number of dwellings unchanged.

DB-SUA in housing: stairs, guarding and changes of level

The stair in a duplex and the communal stair are not justified with the same figures. Their balustrades are: the conditions against climbing and openings are the same throughout the building.

Refurbishment or maintenance?The first thing that decides which part of DB-SI must be justified.

DB-SI in a dwelling refurbishment: what to justify and what not

In a refurbishment DB-SI neither applies in full nor stops applying. It reaches what the work alters, escape routes if occupancy changes and protection systems if what carries them is touched. Existing safety can never be made worse.

50 l/sThe minimum extraction over the hob, with its own duct.CTE DB-HS 3

DB-HS 3: how to justify a dwelling’s ventilation rates

Table 2.1 gives the flows and the justification does not end there. Supply and extract must be balanced, openings and ducts sized and the kitchen solved. A two-bedroom flat shows how.

What a project report must contain under Spain’s building code and how to review it before submission

The report is where a project is justified. Spain’s building code sets its minimum content. What must be written depends on the work, the use, the stage and the council.

Is it allowed? Does it comply? Does the building permit it?The three questions of a shop-to-dwelling change, in order.

Retail to residential: what to check before applying for the permit

Changing a shop’s use is work that needs a project, however small it looks. The first question is not the building code but the plan: if housing is not allowed on that floor and that street, no project will do.

How to use AI in an architecture practice: from brief to permit

When people talk about AI for architects they almost always mean images. But a project is a long chain, from brief to permit. Each stage has work you can delegate and work you cannot.

40% · 20%The national minimum reserve: on rural land being urbanised, and on urbanised land under renewal.TRLSRU, art. 20.1.b

Affordable housing reserve: what to check before fixing the percentage

The national Land Act sets a minimum of 40% or 20% depending on the development. Regional law, the current plan and transitional provisions can change that figure on each site.

Pilot programme

Try Archelo on a real case.

Archelo helps you prepare all your project documents, analyses the drawings, tells you whether it complies before you submit and keeps everything organised. Want to try it?