ChatGPT for architects: what it is good for, where it fails with regulations and how to check it

ChatGPT and the other general assistants draft, summarise and explain well. They are not a source of regulations: use them for the former and never accept a requirement without opening the official text.

In this article
  1. The short version
  2. What it is good for
  3. Where it fails with regulations
  4. How to ask
  5. How to check the answer in five minutes
  6. Your client’s data
  7. When a specialised tool makes sense
  8. Frequently asked questions

The short version

ChatGPT and the other general-purpose assistants are good at drafting, summarising, explaining and organising. They are unreliable when asked for a specific regulatory requirement: the article, the figure and the condition under which it applies. In an architecture practice, use them for the former and never accept a requirement without opening the official text.

The working rule is simple: every figure that ends up in an application needs its regulation, its section and its version. Someone in the practice must have read them. A chat answer, however good it sounds, is not a justification.

What it is good for

There is plenty of practice work where a general assistant genuinely saves time, because it depends on writing well and organising rather than on an exact figure:

TaskWhat to askWhat you check
DraftingA letter to the client, a reply to a neighbour, the text of a fee proposal, a project description for the website.The tone and that it promises nothing you would not do.
SummarisingThe main points of a long bylaw or a technical report you already have in front of you.That no condition is missing: summaries swallow the “unless”.
ExplainingA concept in plain language for a client: what a self-declaration is, what a health and safety coordinator does.That the explanation still holds in your region.
OrganisingTurning site-visit notes into a task list or a meeting into minutes.Dates, names and commitments.
EditingRemoving repetition from the descriptive report, unifying terms, fixing typos.That it does not change the technical meaning of a sentence.

In all of these tasks a mistake is visible and cheap: you read it and fix it. With regulations, that is not the case.

Where it fails with regulations

It quotes from memory

A general model need not consult the official gazette when it answers: it often reproduces what it learnt. It can give a section that does not exist, mix two basic documents or cite an earlier version. Spain’s building code has been amended several times since 2006. The version that counts is the consolidated one published in the BOE, not the one the model remembers.

It gives the figure without the condition

Almost every requirement has a condition of application. An example: the minimum height of a balustrade under DB-SUA 1, section 3.2.1, is 0.90 m where the drop it protects does not exceed 6 m. Otherwise it is 1.10 m, with an exception for narrow stair wells. An answer giving only “0.90 m” or only “1.10 m” is not entirely false but it is no use: it lacks the condition that decides which one applies to your project.

It does not know your town

The local plan, the bylaws, the heritage catalogues and each council’s reading of them change from one town to the next and are rarely well represented in what a general model learnt. For a change of use or works on a listed building, that is half the answer.

It does not see the whole project

Paste a paragraph and it answers about the paragraph. The inconsistencies that matter sit between documents: the area in the report’s schedule that does not match the drawings, the budget that differs from the one in the waste management study, an address from another project left in an annex.

It answers even when data is missing

A good professional asks before answering: what use, what kind of works, which town, which stage. A general assistant tends to answer anyway, assuming what it does not know. The answer sounds confident and is built on an assumption you cannot see.

How to ask

If you are going to use it for a technical question, the way you ask changes the quality of the answer a great deal. What works:

  • Give the full context. Town, region, current and intended use, kind of works (new build, refurbishment, change of use, extension) and project stage.
  • Ask for the source. Regulation, section and version of each figure. Also ask for a clear line between what the rule says and what is interpretation.
  • Allow it not to know. “If you are not sure of a section, say so instead of guessing.”
  • Ask for the conditions, not just the value. “What decides whether one figure or the other applies?”
  • Paste the official text when you have it. Asking it to reason over the section you provide is far more reliable than asking it to remember.

An example of a request that tends to work: “Change of use from shop to dwelling on the ground floor, in Andalusia, existing residential building. Here is section 3.2.1 of DB-SUA 1. The courtyard has a 2.80 m drop. Tell me which balustrade height applies to it and which project data you would need to check.”

How to check the answer in five minutes

  • Open the consolidated text of the regulation in the BOE or, for the building code, on codigotecnico.org.
  • Find the section cited and check that it exists and says what the answer claims.
  • Look at the date of the version in force and whether the works fall under transitional provisions.
  • Read the conditions of application: use, scope, kind of intervention and exceptions.
  • Check whether the local plan or bylaw tightens or qualifies the requirement.
  • Write in the report the regulation, the section and the project figure that complies with it.

If the result is going to be justified in the report, this last step is the one that matters. We explain how to organise it in what a project report must contain.

Your client’s data

A land registry extract, a deed, an identity document or the contract with the client contain personal data. The practice is accountable for how they are processed under the General Data Protection Regulation. Before pasting a document into a general-purpose tool, check its terms: where the data is kept, whether it is used to train models and whether you can switch that off. If in doubt, remove names, identity numbers and personal addresses before using it.

When a specialised tool makes sense

The line is clear: when the question is about your project rather than about regulations in general. Then what is needed is to read every document, cross-check them, apply the rules of the place in their current text and say where each figure comes from.

That is what Archelo does. It checks the report, the drawings in PDF and DXF and the estimate against the building code section by section and the rules of the place. It flags what does not match between documents and says what remains pending when a figure is missing. Its answers rest on the regulations and the project’s documents, with the reference for each figure. We explain it on AI for architects and, more generally, in how to use AI in an architecture practice.

Frequently asked questions

Is ChatGPT reliable for checking Spain’s building code?

To understand a concept or a basic document, it helps. For a specific requirement it is not enough: it can cite a section that does not exist, an earlier version or a figure without its condition of application. Always check it in the consolidated BOE text or on codigotecnico.org.

Can I use ChatGPT to write a project report?

For the wording and style of the descriptive report, yes. The regulatory justification, not without checking it section by section. Every figure must carry its regulation and the project figure that meets it.

Does ChatGPT know which planning rules apply in my town?

Rarely with certainty. Local plans, bylaws and heritage catalogues are municipal and change. A general assistant need not consult the version in force. Start from the council’s own plan and bylaw.

What is the difference between ChatGPT and Archelo?

ChatGPT is a general assistant. Archelo is built for a practice’s technical work. It checks the project’s documents against the official text of the rules of the place and cross-checks report, drawings and estimate. It says where each figure comes from and what remains pending.

Keep reading

10 · 3 · 1The years of liability for structure, habitability and finishes, counted from handover.LOE, art. 17.1

The Building Act in a practice: who answers for what and from when

Each party answers for its own part for ten, three or one year depending on the defect. Every period runs from handover, so a badly closed handover record moves the clock and leaves parts uncovered.

Ground floor plus one, seven to twelve dwellings upstairsThe decree requires the lift installed. The building code settles for leaving room for one.

Accessibility in Andalusia: Decree 293/2009 in housing projects

In a residential building, Decree 293/2009 governs communal areas and reserved dwellings, not the inside of the others. It applies alongside DB-SUA. Where the two differ, the stricter one must be met.

Art. 299.2Other authorities’ approvals come before the permit. A permit cannot be conditional on obtaining them later.LISTA Regulations

How to organise a project application before you submit it

A well-organised application prevents a missing document, an invalid signature or two figures that disagree. The council’s own list is the one that counts. Documents are sorted by when they go in: with the application, before work starts or at completion. Before signing, the same figure has to read the same in every document.

Four jobs that must be certified
  • Execution project
  • Final certificate
  • Legalisation
  • Demolition without explosives

Visado: when certification by the professional body is mandatory

Certification by the professional body is voluntary except for a closed list of work. In building, the list includes the execution project and the final certificate. The basic design is not on it and a permit can be applied for with it.

AI for architects: can it check a project against building regulations?

Software can already verify much of what a project has to state, with the article and page of every figure. What it cannot do is decide what your project means. And nothing failing does not mean it complies.

€450,759.08The contract price, with VAT, from which the study must be the full one.RD 1627/1997, art. 4.1

The basic health and safety study (RD 1627/1997): when it is enough and what it contains

Every project-based job carries a health and safety study, full or basic. Four conditions decide which. The cost threshold is measured on the contract budget with VAT, not on the material execution budget.

Seven minimum contents
  • Estimate and prevention
  • Destination and separation
  • Drawings and specifications
  • Cost

The construction waste management study (RD 105/2008): what it must include

RD 105/2008 requires the waste management study and the designer writes it. It has seven minimum contents and five of them already go in the basic design. A refurbishment adds an inventory of hazardous waste.

1.50 mThe height that most often makes usable area differ from one document to another.

The usable and gross floor area schedule: the most common mistakes

The usable area in a valuation, the one on the energy certificate and the cadastre’s gross area are not measured the same way. Countable area is set by each municipality. That is why a schedule has to say which criterion it uses.

Documents for a building permit application in Spain: the complete file, in order and reviewed

A permit application with a project brings together five groups of documents. Each council publishes its own list, though the core is common across Spain. Before submitting, the most useful check is that they all say the same.

Art. 138What goes by self-declaration in Andalusia. Everything else needs a permit.LISTA

Self-declaration or building permit in Andalusia: when each applies

In Andalusia the permit is the rule and the self-declaration the exception listed in article 138 of the LISTA. Needing a project does not mean needing a permit: a refurbishment with a project on urban land can go by self-declaration if it leaves occupancy, height, buildable area and number of dwellings unchanged.

DB-SUA in housing: stairs, guarding and changes of level

The stair in a duplex and the communal stair are not justified with the same figures. Their balustrades are: the conditions against climbing and openings are the same throughout the building.

Refurbishment or maintenance?The first thing that decides which part of DB-SI must be justified.

DB-SI in a dwelling refurbishment: what to justify and what not

In a refurbishment DB-SI neither applies in full nor stops applying. It reaches what the work alters, escape routes if occupancy changes and protection systems if what carries them is touched. Existing safety can never be made worse.

50 l/sThe minimum extraction over the hob, with its own duct.CTE DB-HS 3

DB-HS 3: how to justify a dwelling’s ventilation rates

Table 2.1 gives the flows and the justification does not end there. Supply and extract must be balanced, openings and ducts sized and the kitchen solved. A two-bedroom flat shows how.

What a project report must contain under Spain’s building code and how to review it before submission

The report is where a project is justified. Spain’s building code sets its minimum content. What must be written depends on the work, the use, the stage and the council.

Is it allowed? Does it comply? Does the building permit it?The three questions of a shop-to-dwelling change, in order.

Retail to residential: what to check before applying for the permit

Changing a shop’s use is work that needs a project, however small it looks. The first question is not the building code but the plan: if housing is not allowed on that floor and that street, no project will do.

How to use AI in an architecture practice: from brief to permit

When people talk about AI for architects they almost always mean images. But a project is a long chain, from brief to permit. Each stage has work you can delegate and work you cannot.

40% · 20%The national minimum reserve: on rural land being urbanised, and on urbanised land under renewal.TRLSRU, art. 20.1.b

Affordable housing reserve: what to check before fixing the percentage

The national Land Act sets a minimum of 40% or 20% depending on the development. Regional law, the current plan and transitional provisions can change that figure on each site.

Pilot programme

Try Archelo on a real case.

Archelo helps you prepare all your project documents, analyses the drawings, tells you whether it complies before you submit and keeps everything organised. Want to try it?

Watch the demo

Request access

Try Archelo on your own projects. Fill in the form and we will email you as soon as your access is ready.

We use these details only to give you access.