The construction waste management study (RD 105/2008): what it must include

RD 105/2008 requires the waste management study and the designer writes it. It has seven minimum contents and five of them already go in the basic design. A refurbishment adds an inventory of hazardous waste.

Seven minimum contents
  • Estimate and prevention
  • Destination and separation
  • Drawings and specifications
  • Cost
In this article
  1. The short version
  2. Who needs it and who signs it
  3. The seven minimum contents
  4. The estimate, with its codes
  5. Refurbishments: the hazardous waste inventory
  6. What Act 7/2022 adds
  7. The deposit and the final paperwork
  8. Before you submit it
  9. Where Archelo helps

The short version

The waste management study is one of those annexes passed from project to project with little more than the job name changed. And it shows quickly, because it is cross-checked against the report, the estimate and the deposit the council asks for. We follow Spain’s consolidated Royal Decree 105/2008, article 30 of Act 7/2022 on waste and contaminated soils and the European list of waste.

Who needs it and who signs it

The decree splits the duties between two parties worth keeping apart (article 2):

  • Producer: the holder of the planning permit or, if the work needs none, the owner of the property. They must include the study in the project. In practice the architect writes it on their behalf.
  • Holder: whoever carries out the work and physically controls the waste, meaning the contractor, its subcontractors and the self-employed. Their employees are not.

Minor domestic construction or repair works fall outside articles 4 and 5 (first additional provision) and are governed by council bylaws. The decree defines them as simple, small-scale works in a home, shop, office or service building. They do not change the volume, use, shared services or number of dwellings and premises. They need no signed project. If the work needs a project, it needs a study.

The seven minimum contents

Article 4.1.a lists what the study must contain. Article 4.2 adds that, for building works, the basic project submitted for the permit must already include items 1 to 4 and item 7, plus the hazardous waste inventory where it applies. Drawings and specifications can wait for the construction project:

ItemWhat it must sayBasic project
1. EstimateQuantity in tonnes and cubic metres, coded with the European list of wasteYes
2. PreventionMeasures to produce less waste on this jobYes
3. DestinationReuse, recovery or disposal operations for each wasteYes
4. SeparationHow the streams are separated on siteYes
5. DrawingsFacilities for storage, handling, separation and other management operationsNo, at construction stage
6. SpecificationsClauses on storage, handling, separation and other operationsNo, at construction stage
7. CostExpected cost of management, as a separate chapter of the estimateYes

The estimate’s separate chapter is easy to forget. Waste management cannot be dissolved into the demolition items or the site overheads: it has to be readable on its own, because it is the figure used for the deposit. How it fits with the other documents is covered in documents for a building permit application.

The estimate, with its codes

Construction and demolition waste sits in chapter 17 of the European list, published by Decision 2014/955/EU. Codes with an asterisk are hazardous. The table gives the usual ones in a building project, with the threshold above which article 5.5 of the decree requires them to be separated:

StreamCodeSeparate above
Concrete17 01 0180 t
Bricks · tiles and ceramics17 01 02 · 17 01 0340 t
Metals: iron and steel · mixed metals17 04 05 · 17 04 072 t
Wood17 02 011 t
Glass17 02 021 t
Plastic17 02 030.5 t
Paper and cardboard15 01 01 (packaging)0.5 t
Gypsum17 08 02No threshold in the decree. See Act 7/2022
Mixed, non-hazardous17 09 04—

Quantities are estimated from the project’s measurements: the cubic metres demolished, the areas of partitions or flooring removed, the packaging of what is installed. The decree sets no ratios per square metre. A tonnage that bears no relation to what the estimate demolishes is easy to spot.

Refurbishments: the hazardous waste inventory

In demolition, refurbishment, repair or alteration work, article 4.1.b also requires an inventory of the hazardous waste that will be produced. Its selective removal must be planned so it is not mixed with the rest. It must go to authorised hazardous waste managers. Act 7/2022 repeats the point in article 30.1: in demolitions, hazardous substances, asbestos in particular, are removed without mixing and handled safely.

In a building of some age it is common to find asbestos-cement downpipes, tanks or sheets (17 06 05*). Sometimes there is also insulation containing asbestos (17 06 01*). Asbestos work has its own safety rules, Royal Decree 396/2006. It is done by a specialist contractor. The study does not solve it: it must identify it. And the estimate must include its removal. A report that mentions asbestos cement while the estimate has no item for it is one of the easiest inconsistencies to see. The retail-to-residential change of use covers others.

What Act 7/2022 adds

The 2022 waste act does not amend the text of Royal Decree 105/2008: its consolidated version in the official gazette is still the original. What it does is add duties in its article 30:

  • From 1 July 2022, non-hazardous construction and demolition waste is sorted at least into wood, minerals (concrete, bricks, tiles, ceramics and stone), metals, glass, plastic and gypsum, preferably on site. Reusable items such as roof tiles, sanitaryware or structural elements are kept apart too.
  • From 1 January 2024, demolition is selective and compulsory, removing at least those streams. Where the work is not required to have a management study, it is done on the basis of a prior study identifying the quantity of each stream.
  • Article 26 sets public authorities a target of 70% by weight of non-hazardous construction and demolition waste going to reuse, recycling or other recovery. It is a target for the waste management plans, not a figure each job must reach.

The act does not repeat the thresholds in article 5.5 of the decree. Before writing the separation section, it is worth checking in the region’s rules and the council bylaw how the act’s sorting duty combines with those thresholds.

The deposit and the final paperwork

Where the work needs a permit, article 4.1.d requires the producer to provide the deposit or equivalent financial guarantee set by the region’s legislation. Article 6.3 says how it is calculated: on the cost in the management study. The authority may raise that cost, with reasons, if it considers it undervalued. Amounts and the return procedure are set by each region and, often, by each council’s bylaw.

During the works, the contractor gives the client a management plan setting out how it will meet the study. Once approved by the site supervision team and accepted by the owner, it becomes a contract document (article 5.1). At the end, the producer must keep for five years the documents proving how the waste was managed (article 4.1.c). They are usually what the council asks for to return the deposit.

Before you submit it

A quick pass over the study and the documents it is checked against:

  • Job name, site, client and stage match the report.
  • Quantities are given in tonnes and cubic metres, with their European list code.
  • Quantities bear a relation to the demolition and measurements in the estimate.
  • In a refurbishment there is a hazardous waste inventory that matches the report and the estimate items.
  • The separation section covers the streams in article 30.2 of Act 7/2022 and the thresholds in article 5.5.
  • Waste management is a separate chapter of the estimate, with the same figure in the study and the summary.
  • The rules cited are current: nothing from Act 10/1998 or Act 22/2011, both repealed.
  • The council bylaw on the deposit and its return has been checked.

If the study comes from a template, the last check is the most useful: search the text for any figure left from the previous job.

Where Archelo helps

Archelo recognises the waste management study among the application’s documents and flags it when it is missing for the type of work. It cross-checks the figures the study shares with the report and the estimate and points out what does not match, with the document and page of each figure. If it is missing, it drafts it with the project’s data and estimates the quantities. It does not choose the waste manager or set the deposit, which depend on the job and the council. You can see how it works on AI for architects.

This article is for information only and does not replace checking the current text of the rules cited, nor each region’s waste legislation and each council’s bylaw, which set the deposit and may add requirements.

Keep reading

10 · 3 · 1The years of liability for structure, habitability and finishes, counted from handover.LOE, art. 17.1

The Building Act in a practice: who answers for what and from when

Each party answers for its own part for ten, three or one year depending on the defect. Every period runs from handover, so a badly closed handover record moves the clock and leaves parts uncovered.

Ground floor plus one, seven to twelve dwellings upstairsThe decree requires the lift installed. The building code settles for leaving room for one.

Accessibility in Andalusia: Decree 293/2009 in housing projects

In a residential building, Decree 293/2009 governs communal areas and reserved dwellings, not the inside of the others. It applies alongside DB-SUA. Where the two differ, the stricter one must be met.

Art. 299.2Other authorities’ approvals come before the permit. A permit cannot be conditional on obtaining them later.LISTA Regulations

How to organise a project application before you submit it

A well-organised application prevents a missing document, an invalid signature or two figures that disagree. The council’s own list is the one that counts. Documents are sorted by when they go in: with the application, before work starts or at completion. Before signing, the same figure has to read the same in every document.

Four jobs that must be certified
  • Execution project
  • Final certificate
  • Legalisation
  • Demolition without explosives

Visado: when certification by the professional body is mandatory

Certification by the professional body is voluntary except for a closed list of work. In building, the list includes the execution project and the final certificate. The basic design is not on it and a permit can be applied for with it.

AI for architects: can it check a project against building regulations?

Software can already verify much of what a project has to state, with the article and page of every figure. What it cannot do is decide what your project means. And nothing failing does not mean it complies.

€450,759.08The contract price, with VAT, from which the study must be the full one.RD 1627/1997, art. 4.1

The basic health and safety study (RD 1627/1997): when it is enough and what it contains

Every project-based job carries a health and safety study, full or basic. Four conditions decide which. The cost threshold is measured on the contract budget with VAT, not on the material execution budget.

1.50 mThe height that most often makes usable area differ from one document to another.

The usable and gross floor area schedule: the most common mistakes

The usable area in a valuation, the one on the energy certificate and the cadastre’s gross area are not measured the same way. Countable area is set by each municipality. That is why a schedule has to say which criterion it uses.

ChatGPT for architects: what it is good for, where it fails with regulations and how to check it

ChatGPT and the other general assistants draft, summarise and explain well. They are not a source of regulations: use them for the former and never accept a requirement without opening the official text.

Documents for a building permit application in Spain: the complete file, in order and reviewed

A permit application with a project brings together five groups of documents. Each council publishes its own list, though the core is common across Spain. Before submitting, the most useful check is that they all say the same.

Art. 138What goes by self-declaration in Andalusia. Everything else needs a permit.LISTA

Self-declaration or building permit in Andalusia: when each applies

In Andalusia the permit is the rule and the self-declaration the exception listed in article 138 of the LISTA. Needing a project does not mean needing a permit: a refurbishment with a project on urban land can go by self-declaration if it leaves occupancy, height, buildable area and number of dwellings unchanged.

DB-SUA in housing: stairs, guarding and changes of level

The stair in a duplex and the communal stair are not justified with the same figures. Their balustrades are: the conditions against climbing and openings are the same throughout the building.

Refurbishment or maintenance?The first thing that decides which part of DB-SI must be justified.

DB-SI in a dwelling refurbishment: what to justify and what not

In a refurbishment DB-SI neither applies in full nor stops applying. It reaches what the work alters, escape routes if occupancy changes and protection systems if what carries them is touched. Existing safety can never be made worse.

50 l/sThe minimum extraction over the hob, with its own duct.CTE DB-HS 3

DB-HS 3: how to justify a dwelling’s ventilation rates

Table 2.1 gives the flows and the justification does not end there. Supply and extract must be balanced, openings and ducts sized and the kitchen solved. A two-bedroom flat shows how.

What a project report must contain under Spain’s building code and how to review it before submission

The report is where a project is justified. Spain’s building code sets its minimum content. What must be written depends on the work, the use, the stage and the council.

Is it allowed? Does it comply? Does the building permit it?The three questions of a shop-to-dwelling change, in order.

Retail to residential: what to check before applying for the permit

Changing a shop’s use is work that needs a project, however small it looks. The first question is not the building code but the plan: if housing is not allowed on that floor and that street, no project will do.

How to use AI in an architecture practice: from brief to permit

When people talk about AI for architects they almost always mean images. But a project is a long chain, from brief to permit. Each stage has work you can delegate and work you cannot.

40% · 20%The national minimum reserve: on rural land being urbanised, and on urbanised land under renewal.TRLSRU, art. 20.1.b

Affordable housing reserve: what to check before fixing the percentage

The national Land Act sets a minimum of 40% or 20% depending on the development. Regional law, the current plan and transitional provisions can change that figure on each site.

Pilot programme

Try Archelo on a real case.

Archelo helps you prepare all your project documents, analyses the drawings, tells you whether it complies before you submit and keeps everything organised. Want to try it?

Watch the demo

Request access

Try Archelo on your own projects. Fill in the form and we will email you as soon as your access is ready.

We use these details only to give you access.