Documents for a building permit application in Spain: the complete file, in order and reviewed

A permit application with a project brings together five groups of documents. Each council publishes its own list, though the core is common across Spain. Before submitting, the most useful check is that they all say the same.

In this article
  1. The short version
  2. When a project is needed
  3. The documents, one by one
  4. Basic or execution project?
  5. Order, names and format
  6. Before submitting: the cross-check
  7. How Archelo prepares it
  8. Frequently asked questions

The short version

A permit application for works that need a project gathers five groups of documents. The first three are the application form and fee, the technical project with its annexes and the documents about the property. Next come those about the architect and the professional body. Last comes whatever sectoral or heritage rules require. Each council publishes its own list, though the core is common across Spain because it comes from national laws and royal decrees.

The hardest thing to spot is not a missing document but documents that disagree: another area, another budget, another address. That is why an application is reviewed as a whole, cross-checking one document against another, before it is submitted.

This guide covers works that need a project. Whether the works go through a permit or a self-declaration is decided by regional legislation and the local bylaw.

When a project is needed

Article 2.2 of the Building Act (LOE) requires a project in three cases:

  • New building works, except minor constructions of simple technique with no residential or public character, built on a single storey.
  • Interventions on existing buildings that alter their architectural configuration. These are total ones and partial ones that essentially change the exterior composition, the volume or the structural system as a whole. They also include those that change the building’s characteristic uses.
  • Total interventions on listed buildings or buildings with environmental or historic-artistic protection. Also partial ones that affect the protected elements.

A change of use from shop to dwelling falls under the second case. We cover it in detail in retail to residential change of use.

The documents, one by one

The project and its annexes

Annex I of Part I of the building code (CTE) sets the content of a project: report, drawings, specifications, quantities and estimate. The report carries its annexes: geotechnical information, structural calculations, fire protection, services, energy performance, quality control plan and health and safety study, among others. On top of that come the documents other rules require:

DocumentWhich rule requires itWhat is worth knowing
Health and safety study or basic studyRoyal Decree 1627/1997The full study is required if the contract execution budget is 75 million pesetas (€450,759.08) or more, if more than 20 workers are employed at once for more than 30 working days, if the labour volume exceeds 500 working days or if there are tunnels, galleries, underground conduits or dams (article 4.1). Otherwise the basic study is enough (article 4.2).
Construction and demolition waste management studyRoyal Decree 105/2008It goes in the execution project (article 4.1.a) with seven minimum contents: coded waste estimate, prevention, destination operations, on-site separation, drawings of the facilities, specification clauses and a cost estimate shown as a separate chapter of the budget.
Project energy performance certificateRoyal Decree 390/2021Required for new buildings and for refurbishments or extensions that renew thermal installations needing a project under the RITE, work on more than 25% of the thermal envelope or extend by more than 10% with over 50 m² of useful area (article 3.1). It is incorporated into the execution project (article 9.2).
Common telecommunications infrastructure projectRoyal Decree-Law 1/1998In buildings under horizontal property, in the cases the rule sets.
Regional justificationsEach region’s rulesAccessibility, habitability or other forms required by the region or the town.

The documents about the property

These are the land registry extract, the cadastral record and, if the building is protected, its heritage catalogue entry. When the applicant is not the owner or the works affect common parts, the corresponding authorisation or the owners’ association agreement is needed. Photographs of the current state are usually requested for refurbishments and protected buildings.

The documents about the architect and the professional body

Royal Decree 1000/2010 makes the professional body’s certification (visado) mandatory for the building execution project when the works need a project under the LOE (article 2.a), as well as for the final completion certificate and other works it lists. The basic project is not on that list: it can be certified voluntarily. Some councils ask instead for a certificate from the professional body confirming the architect’s standing or commission.

Many councils also ask for the Building Construction Statistics questionnaire, filled in with the project’s data.

The application form and the fee

The council’s application form carries its registration entry. It goes with proof of payment of the permit fee and, depending on the town, of the self-assessed construction tax.

Basic or execution project?

In many towns the permit is granted on the basic project and the execution project is submitted before works start. Others ask for the execution project straight away. Each council’s bylaw says which. It is worth reading before deciding what to submit, because it changes the annexes to deliver.

The waste management study belongs, by rule, in the execution project, though some councils ask for it with the basic project to calculate the waste deposit. Something similar happens with the health and safety study.

Order, names and format

The council’s officer reviews in an online portal, document by document. It pays to make that easy:

  • One document per file, as PDF, numbered in the order of the procedure: “001. PROJECT REPORT.pdf”, “002. QUANTITIES AND ESTIMATE.pdf”, “003. DRAWINGS.pdf”.
  • File names without accents or symbols: some portals and programs do not read them well.
  • A cover with an index stating what each file contains and how many pages it has.
  • A header and footer on every page with the project, the site, the architect and the document numbering.
  • Files within the portal’s size limit. If a document exceeds it, split into numbered parts.

Before submitting: the cross-check

These are the checks worth making last, because they look between documents rather than within one:

  • The same address and cadastral reference in the application, the report, the drawings and the annexes.
  • The areas in the report’s schedule equal to those in the drawings, room by room.
  • The same material execution budget in the report, the estimate, the waste study, the health and safety study and the statistics form.
  • The waste management cost as its own chapter of the estimate.
  • The same architect, with the same registration number, in every document.
  • No paragraph, schedule or annex inherited from another project.
  • If the building is protected, the report or authorisation of the heritage authority, where the rules require it.

These inconsistencies pile up easily in the report. We have a guide to its content and a review method in what a project report must contain.

How Archelo prepares it

Archelo first checks that every document the procedure asks for is there and that the documents agree. It then orders and numbers them for the procedure and converts to PDF the annexes the practice wrote in Word. It adds the header and footer to every page and prepares the cover with its index. Everything comes in one file ready to upload to the portal. If the architect accepted changes to the report, the final report includes them.

Documents already signed digitally are included as they are, so the signature stays valid. If a document is missing or something does not comply, the application is marked as a draft. You can see how it works on AI for architects. This guide is for information: the list that counts is the one each council publishes. The rules cited should be checked in their current text.

Frequently asked questions

Which documents are needed to apply for a major works permit?

You need the application form, proof of the fee and the project with report, drawings, specifications, quantities and estimate. Add the health and safety study or the basic one, the waste management study and the energy performance certificate where it applies. For the property, the land registry extract, the cadastral record and, if the building is protected, its catalogue entry. Last, the professional body documents the council asks for. Each town publishes its list.

Must the basic project be certified by the professional body?

It is not mandatory under Royal Decree 1000/2010, which requires certification of the building execution project, not the basic one. It can be certified voluntarily. Some councils ask for a certificate from the professional body about the architect.

When is a full health and safety study needed instead of the basic one?

When the contract execution budget is €450,759.08 or more, when more than 20 people work at once for more than 30 working days, when labour exceeds 500 working days or when there are tunnels, galleries, underground conduits or dams (Royal Decree 1627/1997, article 4).

Can a header be added to a document that is already signed?

Not without invalidating the electronic signature: any later change breaks it. The header and footer go on the final document, which is signed afterwards.

Keep reading

10 · 3 · 1The years of liability for structure, habitability and finishes, counted from handover.LOE, art. 17.1

The Building Act in a practice: who answers for what and from when

Each party answers for its own part for ten, three or one year depending on the defect. Every period runs from handover, so a badly closed handover record moves the clock and leaves parts uncovered.

Ground floor plus one, seven to twelve dwellings upstairsThe decree requires the lift installed. The building code settles for leaving room for one.

Accessibility in Andalusia: Decree 293/2009 in housing projects

In a residential building, Decree 293/2009 governs communal areas and reserved dwellings, not the inside of the others. It applies alongside DB-SUA. Where the two differ, the stricter one must be met.

Art. 299.2Other authorities’ approvals come before the permit. A permit cannot be conditional on obtaining them later.LISTA Regulations

How to organise a project application before you submit it

A well-organised application prevents a missing document, an invalid signature or two figures that disagree. The council’s own list is the one that counts. Documents are sorted by when they go in: with the application, before work starts or at completion. Before signing, the same figure has to read the same in every document.

Four jobs that must be certified
  • Execution project
  • Final certificate
  • Legalisation
  • Demolition without explosives

Visado: when certification by the professional body is mandatory

Certification by the professional body is voluntary except for a closed list of work. In building, the list includes the execution project and the final certificate. The basic design is not on it and a permit can be applied for with it.

AI for architects: can it check a project against building regulations?

Software can already verify much of what a project has to state, with the article and page of every figure. What it cannot do is decide what your project means. And nothing failing does not mean it complies.

€450,759.08The contract price, with VAT, from which the study must be the full one.RD 1627/1997, art. 4.1

The basic health and safety study (RD 1627/1997): when it is enough and what it contains

Every project-based job carries a health and safety study, full or basic. Four conditions decide which. The cost threshold is measured on the contract budget with VAT, not on the material execution budget.

Seven minimum contents
  • Estimate and prevention
  • Destination and separation
  • Drawings and specifications
  • Cost

The construction waste management study (RD 105/2008): what it must include

RD 105/2008 requires the waste management study and the designer writes it. It has seven minimum contents and five of them already go in the basic design. A refurbishment adds an inventory of hazardous waste.

1.50 mThe height that most often makes usable area differ from one document to another.

The usable and gross floor area schedule: the most common mistakes

The usable area in a valuation, the one on the energy certificate and the cadastre’s gross area are not measured the same way. Countable area is set by each municipality. That is why a schedule has to say which criterion it uses.

ChatGPT for architects: what it is good for, where it fails with regulations and how to check it

ChatGPT and the other general assistants draft, summarise and explain well. They are not a source of regulations: use them for the former and never accept a requirement without opening the official text.

Art. 138What goes by self-declaration in Andalusia. Everything else needs a permit.LISTA

Self-declaration or building permit in Andalusia: when each applies

In Andalusia the permit is the rule and the self-declaration the exception listed in article 138 of the LISTA. Needing a project does not mean needing a permit: a refurbishment with a project on urban land can go by self-declaration if it leaves occupancy, height, buildable area and number of dwellings unchanged.

DB-SUA in housing: stairs, guarding and changes of level

The stair in a duplex and the communal stair are not justified with the same figures. Their balustrades are: the conditions against climbing and openings are the same throughout the building.

Refurbishment or maintenance?The first thing that decides which part of DB-SI must be justified.

DB-SI in a dwelling refurbishment: what to justify and what not

In a refurbishment DB-SI neither applies in full nor stops applying. It reaches what the work alters, escape routes if occupancy changes and protection systems if what carries them is touched. Existing safety can never be made worse.

50 l/sThe minimum extraction over the hob, with its own duct.CTE DB-HS 3

DB-HS 3: how to justify a dwelling’s ventilation rates

Table 2.1 gives the flows and the justification does not end there. Supply and extract must be balanced, openings and ducts sized and the kitchen solved. A two-bedroom flat shows how.

What a project report must contain under Spain’s building code and how to review it before submission

The report is where a project is justified. Spain’s building code sets its minimum content. What must be written depends on the work, the use, the stage and the council.

Is it allowed? Does it comply? Does the building permit it?The three questions of a shop-to-dwelling change, in order.

Retail to residential: what to check before applying for the permit

Changing a shop’s use is work that needs a project, however small it looks. The first question is not the building code but the plan: if housing is not allowed on that floor and that street, no project will do.

How to use AI in an architecture practice: from brief to permit

When people talk about AI for architects they almost always mean images. But a project is a long chain, from brief to permit. Each stage has work you can delegate and work you cannot.

40% · 20%The national minimum reserve: on rural land being urbanised, and on urbanised land under renewal.TRLSRU, art. 20.1.b

Affordable housing reserve: what to check before fixing the percentage

The national Land Act sets a minimum of 40% or 20% depending on the development. Regional law, the current plan and transitional provisions can change that figure on each site.

Pilot programme

Try Archelo on a real case.

Archelo helps you prepare all your project documents, analyses the drawings, tells you whether it complies before you submit and keeps everything organised. Want to try it?

Watch the demo

Request access

Try Archelo on your own projects. Fill in the form and we will email you as soon as your access is ready.

We use these details only to give you access.