Documents for a building permit application in Spain: the complete file, in order and reviewed
A permit application with a project brings together five groups of documents. Each council publishes its own list, though the core is common across Spain. Before submitting, the most useful check is that they all say the same.

In this article
The short version
A permit application for works that need a project gathers five groups of documents. The first three are the application form and fee, the technical project with its annexes and the documents about the property. Next come those about the architect and the professional body. Last comes whatever sectoral or heritage rules require. Each council publishes its own list, though the core is common across Spain because it comes from national laws and royal decrees.
The hardest thing to spot is not a missing document but documents that disagree: another area, another budget, another address. That is why an application is reviewed as a whole, cross-checking one document against another, before it is submitted.
This guide covers works that need a project. Whether the works go through a permit or a self-declaration is decided by regional legislation and the local bylaw.
When a project is needed
Article 2.2 of the Building Act (LOE) requires a project in three cases:
- New building works, except minor constructions of simple technique with no residential or public character, built on a single storey.
- Interventions on existing buildings that alter their architectural configuration. These are total ones and partial ones that essentially change the exterior composition, the volume or the structural system as a whole. They also include those that change the building’s characteristic uses.
- Total interventions on listed buildings or buildings with environmental or historic-artistic protection. Also partial ones that affect the protected elements.
A change of use from shop to dwelling falls under the second case. We cover it in detail in retail to residential change of use.
The documents, one by one
The project and its annexes
Annex I of Part I of the building code (CTE) sets the content of a project: report, drawings, specifications, quantities and estimate. The report carries its annexes: geotechnical information, structural calculations, fire protection, services, energy performance, quality control plan and health and safety study, among others. On top of that come the documents other rules require:
| Document | Which rule requires it | What is worth knowing |
|---|---|---|
| Health and safety study or basic study | Royal Decree 1627/1997 | The full study is required if the contract execution budget is 75 million pesetas (€450,759.08) or more, if more than 20 workers are employed at once for more than 30 working days, if the labour volume exceeds 500 working days or if there are tunnels, galleries, underground conduits or dams (article 4.1). Otherwise the basic study is enough (article 4.2). |
| Construction and demolition waste management study | Royal Decree 105/2008 | It goes in the execution project (article 4.1.a) with seven minimum contents: coded waste estimate, prevention, destination operations, on-site separation, drawings of the facilities, specification clauses and a cost estimate shown as a separate chapter of the budget. |
| Project energy performance certificate | Royal Decree 390/2021 | Required for new buildings and for refurbishments or extensions that renew thermal installations needing a project under the RITE, work on more than 25% of the thermal envelope or extend by more than 10% with over 50 m² of useful area (article 3.1). It is incorporated into the execution project (article 9.2). |
| Common telecommunications infrastructure project | Royal Decree-Law 1/1998 | In buildings under horizontal property, in the cases the rule sets. |
| Regional justifications | Each region’s rules | Accessibility, habitability or other forms required by the region or the town. |
The documents about the property
These are the land registry extract, the cadastral record and, if the building is protected, its heritage catalogue entry. When the applicant is not the owner or the works affect common parts, the corresponding authorisation or the owners’ association agreement is needed. Photographs of the current state are usually requested for refurbishments and protected buildings.
The documents about the architect and the professional body
Royal Decree 1000/2010 makes the professional body’s certification (visado) mandatory for the building execution project when the works need a project under the LOE (article 2.a), as well as for the final completion certificate and other works it lists. The basic project is not on that list: it can be certified voluntarily. Some councils ask instead for a certificate from the professional body confirming the architect’s standing or commission.
Many councils also ask for the Building Construction Statistics questionnaire, filled in with the project’s data.
The application form and the fee
The council’s application form carries its registration entry. It goes with proof of payment of the permit fee and, depending on the town, of the self-assessed construction tax.
Basic or execution project?
In many towns the permit is granted on the basic project and the execution project is submitted before works start. Others ask for the execution project straight away. Each council’s bylaw says which. It is worth reading before deciding what to submit, because it changes the annexes to deliver.
The waste management study belongs, by rule, in the execution project, though some councils ask for it with the basic project to calculate the waste deposit. Something similar happens with the health and safety study.
Order, names and format
The council’s officer reviews in an online portal, document by document. It pays to make that easy:
- One document per file, as PDF, numbered in the order of the procedure: “001. PROJECT REPORT.pdf”, “002. QUANTITIES AND ESTIMATE.pdf”, “003. DRAWINGS.pdf”.
- File names without accents or symbols: some portals and programs do not read them well.
- A cover with an index stating what each file contains and how many pages it has.
- A header and footer on every page with the project, the site, the architect and the document numbering.
- Files within the portal’s size limit. If a document exceeds it, split into numbered parts.
Before submitting: the cross-check
These are the checks worth making last, because they look between documents rather than within one:
- The same address and cadastral reference in the application, the report, the drawings and the annexes.
- The areas in the report’s schedule equal to those in the drawings, room by room.
- The same material execution budget in the report, the estimate, the waste study, the health and safety study and the statistics form.
- The waste management cost as its own chapter of the estimate.
- The same architect, with the same registration number, in every document.
- No paragraph, schedule or annex inherited from another project.
- If the building is protected, the report or authorisation of the heritage authority, where the rules require it.
These inconsistencies pile up easily in the report. We have a guide to its content and a review method in what a project report must contain.
How Archelo prepares it
Archelo first checks that every document the procedure asks for is there and that the documents agree. It then orders and numbers them for the procedure and converts to PDF the annexes the practice wrote in Word. It adds the header and footer to every page and prepares the cover with its index. Everything comes in one file ready to upload to the portal. If the architect accepted changes to the report, the final report includes them.
Documents already signed digitally are included as they are, so the signature stays valid. If a document is missing or something does not comply, the application is marked as a draft. You can see how it works on AI for architects. This guide is for information: the list that counts is the one each council publishes. The rules cited should be checked in their current text.
Frequently asked questions
Which documents are needed to apply for a major works permit?
You need the application form, proof of the fee and the project with report, drawings, specifications, quantities and estimate. Add the health and safety study or the basic one, the waste management study and the energy performance certificate where it applies. For the property, the land registry extract, the cadastral record and, if the building is protected, its catalogue entry. Last, the professional body documents the council asks for. Each town publishes its list.
Must the basic project be certified by the professional body?
It is not mandatory under Royal Decree 1000/2010, which requires certification of the building execution project, not the basic one. It can be certified voluntarily. Some councils ask for a certificate from the professional body about the architect.
When is a full health and safety study needed instead of the basic one?
When the contract execution budget is €450,759.08 or more, when more than 20 people work at once for more than 30 working days, when labour exceeds 500 working days or when there are tunnels, galleries, underground conduits or dams (Royal Decree 1627/1997, article 4).
Can a header be added to a document that is already signed?
Not without invalidating the electronic signature: any later change breaks it. The header and footer go on the final document, which is signed afterwards.