Visado: when certification by the professional body is mandatory

Certification by the professional body is voluntary except for a closed list of work. In building, the list includes the execution project and the final certificate. The basic design is not on it and a permit can be applied for with it.

Four jobs that must be certified
  • Execution project
  • Final certificate
  • Legalisation
  • Demolition without explosives
In this article
  1. The short version
  2. Voluntary as a rule, mandatory by list
  3. The work that must be certified
  4. The basic design, the permit and the self-declaration
  5. What the professional body checks and what it does not
  6. When, where and the exceptions
  7. Common cases in a practice
  8. Before taking it to the professional body
  9. Where Archelo helps
  10. Frequently asked questions

The short version

This guide explains which of an architect’s work must be certified by the professional body, why the basic design need not be, what the body checks and what it does not, when and where certification happens, the exceptions and a table of the usual cases. Everything comes from the consolidated text of Royal Decree 1000/2010, article 13 of the Professional Bodies Act 2/1974, the Building Act and the Spanish building code in the official gazette. For Andalusia it draws on the LISTA regulation published in the regional gazette (BOJA).

Voluntary as a rule, mandatory by list

Since 2009, article 13 of the Professional Bodies Act starts from certification being voluntary. Bodies for technical professions certify work when the client asks, including a public authority acting as such. They also certify when the Government requires it by royal decree. To require it there must be a direct link between the work and people’s safety. Certification must also be the most proportionate means of control. The Act adds that professional bodies cannot impose certification themselves or through their statutes.

Royal Decree 1000/2010, in force since 1 October 2010, is that decree. Its article 2 makes certification mandatory only for the work it lists. Its repealing provision voids any rule of equal or lower rank requiring certification for other work, as well as conflicting internal rules of the professional bodies. If a piece of work is not on the list, certification is the client’s choice.

The work that must be certified

Of the nine items in article 2, four concern an architect’s work. The other five cover blasting, explosives, fireworks and mining.

WorkWhen it is mandatoryRD 1000/2010
Construction design for a buildingWhen the works require a project under article 2.2 of the LOEArt. 2(a)
Final completion certificate for a buildingFor the same works, with the changes made and the list of inspections as annexesArt. 2(b)
Construction design and completion certificate for a legalisationWhen they must be submitted in the legalisation procedure under planning rulesArt. 2(c)
Demolition project without explosivesWhen the applicable planning rules require oneArt. 2(d)

The key is article 2.2 of the LOE, which decides which works need a project: new construction except minor single-storey structures of technical simplicity that are neither residential nor public, interventions on existing buildings that alter their architectural configuration (full ones, partial ones that substantially change the exterior composition, the volume or the structural system and those that change the main uses) and interventions on protected buildings that affect what is protected. That is why a retail-to-residential change of use needs a certified construction design even when the works are light.

Under section II.3.3 of annex II to Part I of the building code, the final completion certificate carries as annexes a description of the changes made during the works with the developer’s agreement together with the list of inspections carried out with their results. Certification of the certificate covers that documentation.

The basic design, the permit and the self-declaration

The basic design is not on the list. It can be certified if the client asks. It is not mandatory. Part of the confusion comes from the building code itself: its 2006 annex III defines the basic design as sufficient to apply for a permit once the required certification has been obtained. That definition predates Royal Decree 1000/2010, whose closed list does not include the basic design.

In Andalusia the LISTA regulation says so expressly. Its article 299.1(a) allows a building permit to be applied for with the basic design. Works cannot start, however, until the construction design has been submitted, certified where national rules require it. Article 300 repeats that projects may be certified voluntarily and that certification is mandatory where national rules say so. And article 293.2 attaches the self-declaration to the required technical project, certified when those same rules demand it.

Some councils ask, with the basic design, for a certificate from the professional body confirming the architect’s standing instead of certification. It is worth checking each council’s bylaw or portal. The full application file is covered in the guide to building permit documents.

What the professional body checks and what it does not

Article 13.2 of the Professional Bodies Act sets what certification checks, at a minimum:

  • The author’s identity and professional standing, against the register of members.
  • The formal correctness and completeness of the documents, under the rules that apply to the work.

The certification must state clearly what it covers and which points it has checked. It covers neither fees and contract terms nor the technical review of the professional content of the work. In other words, the body does not check whether the structure is correctly calculated or whether the design meets the building code. That responsibility stays with the author.

If damage arises from certified work for which the author is liable, the body is secondarily liable and only for defects it should have spotted when certifying and that relate directly to what it certified (article 13.3). Where certification is mandatory its cost must be reasonable, not excessive or discriminatory. Bodies publish their prices (article 13.4).

When, where and the exceptions

  • Before submission. Mandatory certification is obtained before the work is submitted to the authority. It can never be added afterwards (article 6.2).
  • Once. If the project is completed with partial projects or other technical documents, certifying the whole once, at one body, is enough: the one for the main discipline. Each part need not be certified (article 3).
  • At the body for the main discipline, that of the professional responsible for the whole. Where the professional organisation has regional bodies, any of them can certify (article 5).
  • The completion certificate, at a body competent in site direction or in construction management. Either one is enough (article 5.1).
  • Membership. Mandatory certification can only be refused for not being a member when membership is compulsory for that work (article 6.3).

What matters in practice is the order. The document has to be final before it is signed and certified, because any page added afterwards breaks the electronic signature and falls outside the certification. Header, footer and cover go on before the signature.

In public works, if the project goes through the contracting authority’s project supervision office, its report replaces certification (article 4.1). The contracting authority may also waive it when its procurement process already checks the author’s identity and standing and the formal correctness of the work (article 4.2). The LISTA regulation includes both routes in its article 300.2.

For work not on the list, the central Government does not require certification in its contracts, unless the Council of Ministers agrees an exception (sole additional provision). Professionals from another EU state working in Spain under the freedom to provide services must certify in the same cases as Spanish ones (article 7).

Common cases in a practice

The table applies the article 2 list to everyday commissions. Anything not on it is voluntary, although the client or the council may ask for certification.

CommissionMandatory certification?Why
New detached house: construction designYesNew residential building, requires a project (LOE 2.2(a))
The same house: basic design for the permitNoThe basic design is not on the article 2 list
Retail-to-residential change of useYes, the construction designChanges the main use (LOE 2.2(b))
Interior refurbishment not touching structure, façade or useNo, unless the LOE requires a projectDoes not alter the architectural configuration
Partial works affecting protected elementsYes, the construction designLOE 2.2(c)
Completion certificate for works that require a projectYesArt. 2(b)
Legalisation of works already builtYes, if the procedure requires a project and certificateArt. 2(c)
Demolition without explosives with a projectYesArt. 2(d)
Energy performance certificate, building assessment report, valuationNoNot on the list

Before taking it to the professional body

  • Decide under article 2.2 of the LOE whether the works require a project. That decides whether the construction design must be certified.
  • The final document, with cover, index, header and footer, before signing.
  • Every author’s electronic signature after the document is closed. Certification after the signatures.
  • Partial projects and technical annexes in the same file, for a single certification.
  • Certify before submitting to the council, never after.
  • In the completion certificate, the description of changes and the list of inspections as annexes.
  • Check whether the council asks for anything with the basic design: voluntary certification or a certificate of the architect’s standing.

Where Archelo helps

Archelo helps you prepare what goes for certification: it checks that the documents the procedure asks for are there and that they agree, orders and numbers them, adds the header and footer to every page and prepares the cover with its index, all before you sign. So what you sign and certify is the final document. See it on AI for architects.

This article is for information only and does not replace checking the current text of Royal Decree 1000/2010, the other rules cited, each professional body’s statutes and fees or each council’s bylaw.

Frequently asked questions

Does the basic design have to be certified?

No. Article 2 of Royal Decree 1000/2010 does not include it in its closed list. It can be certified if the client asks. Work cannot start without the certified execution project when the works need a project under the LOE.

Which of an architect’s jobs must be certified?

Four: the execution project and the final certificate when the works need a project under article 2.2 of the LOE, those required for a legalisation, and the demolition project without explosives where planning rules provide for it.

Can a project be certified after it has been submitted?

Not if certification is mandatory. Article 6.2 of Royal Decree 1000/2010 requires it before the work is submitted to the authority and rules out certifying it afterwards.

Does the professional body check that the project meets the building code?

No. Under article 13.2 of the Professional Bodies Act it checks the author’s identity and entitlement and the formal correctness and completeness of the documents. The technical review of the professional content stays outside.

Keep reading

10 · 3 · 1The years of liability for structure, habitability and finishes, counted from handover.LOE, art. 17.1

The Building Act in a practice: who answers for what and from when

Each party answers for its own part for ten, three or one year depending on the defect. Every period runs from handover, so a badly closed handover record moves the clock and leaves parts uncovered.

Ground floor plus one, seven to twelve dwellings upstairsThe decree requires the lift installed. The building code settles for leaving room for one.

Accessibility in Andalusia: Decree 293/2009 in housing projects

In a residential building, Decree 293/2009 governs communal areas and reserved dwellings, not the inside of the others. It applies alongside DB-SUA. Where the two differ, the stricter one must be met.

Art. 299.2Other authorities’ approvals come before the permit. A permit cannot be conditional on obtaining them later.LISTA Regulations

How to organise a project application before you submit it

A well-organised application prevents a missing document, an invalid signature or two figures that disagree. The council’s own list is the one that counts. Documents are sorted by when they go in: with the application, before work starts or at completion. Before signing, the same figure has to read the same in every document.

AI for architects: can it check a project against building regulations?

Software can already verify much of what a project has to state, with the article and page of every figure. What it cannot do is decide what your project means. And nothing failing does not mean it complies.

€450,759.08The contract price, with VAT, from which the study must be the full one.RD 1627/1997, art. 4.1

The basic health and safety study (RD 1627/1997): when it is enough and what it contains

Every project-based job carries a health and safety study, full or basic. Four conditions decide which. The cost threshold is measured on the contract budget with VAT, not on the material execution budget.

Seven minimum contents
  • Estimate and prevention
  • Destination and separation
  • Drawings and specifications
  • Cost

The construction waste management study (RD 105/2008): what it must include

RD 105/2008 requires the waste management study and the designer writes it. It has seven minimum contents and five of them already go in the basic design. A refurbishment adds an inventory of hazardous waste.

1.50 mThe height that most often makes usable area differ from one document to another.

The usable and gross floor area schedule: the most common mistakes

The usable area in a valuation, the one on the energy certificate and the cadastre’s gross area are not measured the same way. Countable area is set by each municipality. That is why a schedule has to say which criterion it uses.

ChatGPT for architects: what it is good for, where it fails with regulations and how to check it

ChatGPT and the other general assistants draft, summarise and explain well. They are not a source of regulations: use them for the former and never accept a requirement without opening the official text.

Documents for a building permit application in Spain: the complete file, in order and reviewed

A permit application with a project brings together five groups of documents. Each council publishes its own list, though the core is common across Spain. Before submitting, the most useful check is that they all say the same.

Art. 138What goes by self-declaration in Andalusia. Everything else needs a permit.LISTA

Self-declaration or building permit in Andalusia: when each applies

In Andalusia the permit is the rule and the self-declaration the exception listed in article 138 of the LISTA. Needing a project does not mean needing a permit: a refurbishment with a project on urban land can go by self-declaration if it leaves occupancy, height, buildable area and number of dwellings unchanged.

DB-SUA in housing: stairs, guarding and changes of level

The stair in a duplex and the communal stair are not justified with the same figures. Their balustrades are: the conditions against climbing and openings are the same throughout the building.

Refurbishment or maintenance?The first thing that decides which part of DB-SI must be justified.

DB-SI in a dwelling refurbishment: what to justify and what not

In a refurbishment DB-SI neither applies in full nor stops applying. It reaches what the work alters, escape routes if occupancy changes and protection systems if what carries them is touched. Existing safety can never be made worse.

50 l/sThe minimum extraction over the hob, with its own duct.CTE DB-HS 3

DB-HS 3: how to justify a dwelling’s ventilation rates

Table 2.1 gives the flows and the justification does not end there. Supply and extract must be balanced, openings and ducts sized and the kitchen solved. A two-bedroom flat shows how.

What a project report must contain under Spain’s building code and how to review it before submission

The report is where a project is justified. Spain’s building code sets its minimum content. What must be written depends on the work, the use, the stage and the council.

Is it allowed? Does it comply? Does the building permit it?The three questions of a shop-to-dwelling change, in order.

Retail to residential: what to check before applying for the permit

Changing a shop’s use is work that needs a project, however small it looks. The first question is not the building code but the plan: if housing is not allowed on that floor and that street, no project will do.

How to use AI in an architecture practice: from brief to permit

When people talk about AI for architects they almost always mean images. But a project is a long chain, from brief to permit. Each stage has work you can delegate and work you cannot.

40% · 20%The national minimum reserve: on rural land being urbanised, and on urbanised land under renewal.TRLSRU, art. 20.1.b

Affordable housing reserve: what to check before fixing the percentage

The national Land Act sets a minimum of 40% or 20% depending on the development. Regional law, the current plan and transitional provisions can change that figure on each site.

Pilot programme

Try Archelo on a real case.

Archelo helps you prepare all your project documents, analyses the drawings, tells you whether it complies before you submit and keeps everything organised. Want to try it?

Watch the demo

Request access

Try Archelo on your own projects. Fill in the form and we will email you as soon as your access is ready.

We use these details only to give you access.