Accessibility in Andalusia: Decree 293/2009 in housing projects

In a residential building, Decree 293/2009 governs communal areas and reserved dwellings, not the inside of the others. It applies alongside DB-SUA. Where the two differ, the stricter one must be met.

Ground floor plus one, seven to twelve dwellings upstairsThe decree requires the lift installed. The building code settles for leaving room for one.
In this article
  1. The short version
  2. What the decree governs in a residential building
  3. The decree and DB-SUA side by side
  4. When a lift is required
  5. Reserved dwellings
  6. What a reserved dwelling is like inside
  7. Refurbishments and changes of use
  8. What the project must contain
  9. Where Archelo helps
  10. Frequently asked questions

The short version

The figures and articles below come from the consolidated text of Decree 293/2009 published by the official gazette, the current DB-SUA and the Junta de Andalucía’s justification forms. Where a row compares the two, the last column gives the figure that ends up in the design.

What the decree governs in a residential building

Article 2.1 of the regulation sets out its scope. Two items matter for housing. Item (j) covers the communal outdoor and indoor spaces, installations, facilities and elements of any residential building, publicly or privately developed, that is built, refurbished or changes use. Item (i) covers dwellings reserved for people with reduced mobility that are built or refurbished.

Outside it are the inside of ordinary dwellings and, as far as lifts and access between floors go, single dwellings built by the owner for their own use (article 106.5). DB-SUA says the same from its side: within the dwellings, detached houses and their private outdoor areas included, accessibility is only required in those that must be accessible (SUA 9, section 1, point 2).

The garage of a residential building counts as a shared space even when the parking spaces are privately owned. It must therefore be reachable from the communal areas by a ramp or by a lift where one is required (article 103.3). The lift or the shaft reserved for it must reach the basement car park and the roof if the roof is accessible (article 106.4).

The decree and DB-SUA side by side

Article 100 of the regulation applies preferentially to communal areas and reserved dwellings, unless sector rules set stricter requirements. In practice the design meets both at once and, for each parameter, the stricter figure governs. The Junta’s own forms have one column for DB-SUA and another for the decree. The table lists the differences that come up most in communal areas.

ParameterDB-SUADecree 293/2009What gets designed
Width of communal corridors≥ 1.10 m (annex A)≥ 1.20 m (arts. 108 and 66.2)1.20 m
Local narrowings≥ 1.00 m, length ≤ 0.50 m, ≥ 0.65 m from doors and turns≥ 0.90 m, length under 0.50 m1.00 m, under 0.50 m long, 0.65 m from doors and turns
Entrance hallØ 1.50 mØ 1.50 m clear of door swings (art. 66.1)Ø 1.50 m clear
Doors≥ 0.80 m at the frame and 0.78 m with the leaf open≥ 0.80 m, opening to at least 90º (art. 67)Both conditions
Handle height0.80 to 1.20 m0.80 to 1.00 m (form III)0.80 to 1.00 m
Communal stairClear width 1.00 m (SUA 1, table 4.1)1 m clear, handrails projecting under 12 cm not deducted (art. 107(a))1.00 m
Stair landingsAs SUA 1Ø 1.20 m where dwelling doors open onto them, 1 m elsewhere (art. 107(b))Ø 1.20 m on floor landings

The stair and guarding conditions the code sets inside and outside dwellings are in the guide to DB-SUA in dwellings. Where the building has reserved dwellings, the entry phone, letterboxes and communal stopcocks must also sit no higher than 1.20 m (article 104.2).

When a lift is required

Article 106.2 of the decree decides by storeys above ground and number of dwellings. Section 1.1.2 of SUA 9 decides by the storeys to be climbed from an accessible entrance and by the dwellings on floors without an accessible entrance. The two rules do not coincide, so both have to be checked.

Multi-dwelling buildingDecree 293/2009, art. 106.2DB-SUA, SUA 9 1.1.2
Two storeys above ground, up to six dwellingsStructural provision for a future lift, with the layout changes shown in the construction designDimensional and structural provision, unless more than 12 dwellings are on floors without an accessible entrance
Two storeys above ground, more than six dwellingsLiftProvision while no more than 12 dwellings are on floors without an accessible entrance. A lift if there are
Three storeys or more, any number of dwellingsLiftA lift if more than two storeys must be climbed from the accessible entrance to any dwelling or communal area
Floors with reserved or accessible dwellingsLift, ramp or moving walk also serving their ancillary spaces (art. 123)Accessible lift or ramp to those floors and their associated elements

The case that most often surprises is a ground floor plus one upper floor with seven to twelve dwellings upstairs: the code is satisfied with the provision, the decree requires the lift installed. Where there are several alternatives to the stair, only one of them has to be accessible (article 106.3).

Reserved dwellings

The reserve in article 111.1 is mandatory in projects for protected housing and for any other housing built, developed or subsidised by public authorities and their bodies, whether a public or a private developer carries them out. In an unsubsidised private development it is not mandatory: the developer may reserve voluntarily and access whatever incentives are regulated (article 111.2).

Dwellings in the developmentReserved dwellings
17 to 391
40 to 662
67 to 993
100 to 1334
134 to 1655
166 or more3%, rounding up from 0.5

Linked ancillary units, such as the parking space or storage room, are reserved on the same terms (article 111.3). Cooperatives and owners’ communities building for their own use are exempt unless one of their members has reduced mobility (article 111.4). Reserved dwellings have the same brief and the same position as the rest of the development (article 114). A garage used only by the community has as many accessible spaces as there are reserved dwellings (article 103.2).

In privately developed protected housing, the interior fit-out can be replaced by a bank guarantee of at least 15% of the maximum sale price, lodged with the provisional classification. The project must then identify, justify, define and cost the adaptation works (article 112). How land is reserved for protected housing is a separate matter, covered in the affordable housing reserve in local plans.

What a reserved dwelling is like inside

Section 4 of the chapter sets the interior conditions. These are the ones that shape the plan most:

  • Corridors of 0.90 m when straight and 1 m at turns and in front of doors not perpendicular to the direction of travel. In the hall, a 1.20 m circle clear of doors and furniture (article 115).
  • Terraces and balconies with a threshold of no more than 2 cm from inside and under 5 cm from outside (article 116).
  • Kitchen with a 1.20 m circle in front of the door and the sink, 0.70 m between units and, under the sink, a space 0.70 m high, 0.60 m deep and 0.80 m wide. Work areas are drawn at 1:50 (article 119).
  • Every bedroom with a 1.20 m circle in front of the door and beside one side of the bed. Between obstacles, 0.80 m (article 120).
  • Every bathroom with a 1.20 m circle clear of the door swing, a level-access shower, a basin at 0.70 to 0.80 m with frontal approach, a WC at 0.45 to 0.50 m with two grab rails and 0.70 m clear beside the WC and the shower. The bidet may be left out (article 121).
  • Switches, windows, blinds and entry phone no higher than 1.20 m, with no rotary switches (articles 117 and 118).

Article 9.1(a) requires the furnished plan of these dwellings to show beds, wardrobes and bedside tables, the sink and appliances, the table, chairs and sofa. The 1.20 m circles can only be checked with the furniture drawn in.

Refurbishments and changes of use

In a partial refurbishment the regulation only applies to the elements or parts being changed, even if the use stays the same. If only the use of one area changes, the conditions apply only to that area (article 2.2). For communal areas of a residential building being refurbished, item (j) of article 2.1 repeats the same rule.

Where the solution does not fit, the decree offers two ways out. In refurbishments where a lift or ramp is physically unworkable, stair lifts or platform lifts are allowed if they meet article 75: independent use from a wheelchair, permanent installation and certified conformity (article 106.6). And for any work on an existing building or change of use, the first additional provision allows departing from the regulation when the ground, the building or a historical, artistic, environmental or regulatory constraint prevents compliance. The report must state which articles cannot be met, why and what solution is proposed. The drawings must locate them.

DB-SUA has its own criterion for existing buildings: if compliance is not technically or economically viable or conflicts with the level of protection, solutions are applied that achieve the greatest possible adaptation. The final works documentation records any resulting limits on use. In a retail-to-residential change of use or a protected building that justification is often the most delicate part of the report.

What the project must contain

Chapter III of the preliminary title sets the minimum content. The report describes the accessibility solutions and justifies them with the regulation’s parameters beside the project’s, so that they can be compared (article 7). That is what the forms approved by the Order of 9 January 2012 are for: form III for the communal areas of residential buildings and form IV for reserved dwellings. The specifications set out the requirements for the related materials and units (article 8) and the estimate describes, in its unit prices, the elements intended for people with disabilities (article 10).

  • Decide which parts of the building are in scope: communal areas, reserved dwellings and, in a refurbishment, only what changes.
  • Check each parameter against DB-SUA and against the decree. The stricter figure is the one designed.
  • Check the lift against article 106.2 and SUA 9. Where one is needed, it goes down to the garage and up to an accessible roof.
  • Count the dwellings in the development and, if there is public funding or a public developer, the reserved ones with their ancillary units.
  • Fill in form III and, if there is a reserve, form IV, with values that can be measured on the drawings.
  • Label the title blocks «Planos de Accesibilidad». If they sit inside another drawing, say so in its title block (article 9.3).
  • Dimension doors, corridors, stairs and ramps, draw door swings and furnish the reserved dwellings.
  • If something cannot be met, cite the article, give the reason and locate it on plan.

As for the decree, the consolidated text in the official gazette shows 4 October 2017 as its latest amendment. Before submitting, it is worth confirming in the regional gazette (BOJA) that nothing later has changed it and checking whether the municipal bylaw asks for more: the form has a column for it. The rest of the application file is covered in the guide to building permit documents.

Where Archelo helps

Archelo helps you draft the accessibility section of the report from the project’s data and check that the drawings include the graphic justification. It flags a report that declares the decree applicable in one section while the forms call it not applicable. It also helps you compare across documents the number of dwellings and storeys on which the lift and the reserve depend, with the document and page of each figure. More on AI for architects.

Frequently asked questions

Does Decree 293/2009 apply to the inside of every dwelling in a building?

No. In a residential building it governs the communal areas and the dwellings reserved for people with reduced mobility (article 2.1, items i and j). The inside of every other dwelling is outside its scope, as it is under DB-SUA.

How wide must communal corridors be in Andalusia?

1.20 m clear, with local narrowings under 50 cm long that leave at least 0.90 m (articles 108 and 66.2 of the regulation). DB-SUA accepts 1.10 m in the communal areas of housing, so the decree’s figure is the one designed.

When does Decree 293/2009 require a lift?

In buildings of two storeys above ground with more than six dwellings and in any building of three or more storeys whatever the number of dwellings. With two storeys and six dwellings or fewer, reserving the structural space for a future lift is enough (article 106.2).

How many dwellings must be reserved for people with reduced mobility?

In protected developments, or those built or subsidised by public authorities, one from 17 to 39 dwellings, two from 40 to 66, three from 67 to 99, four from 100 to 133 and five from 134 to 165. From 166 upwards, 3% rounded (article 111.1). In an unsubsidised private development the reserve is voluntary.

What happens if a refurbishment cannot meet the decree?

The first additional provision allows departing from the regulation in existing buildings when the ground, the building or a historical, artistic, environmental or regulatory constraint prevents compliance. The report states which articles are not met, why and what solution is proposed. The drawings locate them.

Keep reading

10 · 3 · 1The years of liability for structure, habitability and finishes, counted from handover.LOE, art. 17.1

The Building Act in a practice: who answers for what and from when

Each party answers for its own part for ten, three or one year depending on the defect. Every period runs from handover, so a badly closed handover record moves the clock and leaves parts uncovered.

Art. 299.2Other authorities’ approvals come before the permit. A permit cannot be conditional on obtaining them later.LISTA Regulations

How to organise a project application before you submit it

A well-organised application prevents a missing document, an invalid signature or two figures that disagree. The council’s own list is the one that counts. Documents are sorted by when they go in: with the application, before work starts or at completion. Before signing, the same figure has to read the same in every document.

Four jobs that must be certified
  • Execution project
  • Final certificate
  • Legalisation
  • Demolition without explosives

Visado: when certification by the professional body is mandatory

Certification by the professional body is voluntary except for a closed list of work. In building, the list includes the execution project and the final certificate. The basic design is not on it and a permit can be applied for with it.

AI for architects: can it check a project against building regulations?

Software can already verify much of what a project has to state, with the article and page of every figure. What it cannot do is decide what your project means. And nothing failing does not mean it complies.

€450,759.08The contract price, with VAT, from which the study must be the full one.RD 1627/1997, art. 4.1

The basic health and safety study (RD 1627/1997): when it is enough and what it contains

Every project-based job carries a health and safety study, full or basic. Four conditions decide which. The cost threshold is measured on the contract budget with VAT, not on the material execution budget.

Seven minimum contents
  • Estimate and prevention
  • Destination and separation
  • Drawings and specifications
  • Cost

The construction waste management study (RD 105/2008): what it must include

RD 105/2008 requires the waste management study and the designer writes it. It has seven minimum contents and five of them already go in the basic design. A refurbishment adds an inventory of hazardous waste.

1.50 mThe height that most often makes usable area differ from one document to another.

The usable and gross floor area schedule: the most common mistakes

The usable area in a valuation, the one on the energy certificate and the cadastre’s gross area are not measured the same way. Countable area is set by each municipality. That is why a schedule has to say which criterion it uses.

ChatGPT for architects: what it is good for, where it fails with regulations and how to check it

ChatGPT and the other general assistants draft, summarise and explain well. They are not a source of regulations: use them for the former and never accept a requirement without opening the official text.

Documents for a building permit application in Spain: the complete file, in order and reviewed

A permit application with a project brings together five groups of documents. Each council publishes its own list, though the core is common across Spain. Before submitting, the most useful check is that they all say the same.

Art. 138What goes by self-declaration in Andalusia. Everything else needs a permit.LISTA

Self-declaration or building permit in Andalusia: when each applies

In Andalusia the permit is the rule and the self-declaration the exception listed in article 138 of the LISTA. Needing a project does not mean needing a permit: a refurbishment with a project on urban land can go by self-declaration if it leaves occupancy, height, buildable area and number of dwellings unchanged.

DB-SUA in housing: stairs, guarding and changes of level

The stair in a duplex and the communal stair are not justified with the same figures. Their balustrades are: the conditions against climbing and openings are the same throughout the building.

Refurbishment or maintenance?The first thing that decides which part of DB-SI must be justified.

DB-SI in a dwelling refurbishment: what to justify and what not

In a refurbishment DB-SI neither applies in full nor stops applying. It reaches what the work alters, escape routes if occupancy changes and protection systems if what carries them is touched. Existing safety can never be made worse.

50 l/sThe minimum extraction over the hob, with its own duct.CTE DB-HS 3

DB-HS 3: how to justify a dwelling’s ventilation rates

Table 2.1 gives the flows and the justification does not end there. Supply and extract must be balanced, openings and ducts sized and the kitchen solved. A two-bedroom flat shows how.

What a project report must contain under Spain’s building code and how to review it before submission

The report is where a project is justified. Spain’s building code sets its minimum content. What must be written depends on the work, the use, the stage and the council.

Is it allowed? Does it comply? Does the building permit it?The three questions of a shop-to-dwelling change, in order.

Retail to residential: what to check before applying for the permit

Changing a shop’s use is work that needs a project, however small it looks. The first question is not the building code but the plan: if housing is not allowed on that floor and that street, no project will do.

How to use AI in an architecture practice: from brief to permit

When people talk about AI for architects they almost always mean images. But a project is a long chain, from brief to permit. Each stage has work you can delegate and work you cannot.

40% · 20%The national minimum reserve: on rural land being urbanised, and on urbanised land under renewal.TRLSRU, art. 20.1.b

Affordable housing reserve: what to check before fixing the percentage

The national Land Act sets a minimum of 40% or 20% depending on the development. Regional law, the current plan and transitional provisions can change that figure on each site.

Pilot programme

Try Archelo on a real case.

Archelo helps you prepare all your project documents, analyses the drawings, tells you whether it complies before you submit and keeps everything organised. Want to try it?

Watch the demo

Request access

Try Archelo on your own projects. Fill in the form and we will email you as soon as your access is ready.

We use these details only to give you access.