The basic health and safety study (RD 1627/1997): when it is enough and what it contains

Every project-based job carries a health and safety study, full or basic. Four conditions decide which. The cost threshold is measured on the contract budget with VAT, not on the material execution budget.

€450,759.08The contract price, with VAT, from which the study must be the full one.RD 1627/1997, art. 4.1
In this article
  1. The short version
  2. When the full study is required
  3. Two worked examples
  4. What the basic study must contain
  5. Special risks and later work
  6. Who signs it and what comes next
  7. Before you submit it
  8. Where Archelo helps

The short version

The basic health and safety study is, together with the waste study, an annex that gets copied from one project to the next. Before opening the template, it is worth asking whether a basic study is enough for this job. We follow the consolidated text of Royal Decree 1627/1997 in Spain’s official gazette and the technical guide by INSST, the national occupational safety institute. That guide is not binding.

When the full study is required

Article 4.1 requires the client to commission the full health and safety study when any of these conditions applies. If none does, article 4.2 requires the basic study. No project-based job goes without one or the other:

ConditionThresholdHow it is checked
a) BudgetContract execution budget of 75 million pesetas (€450,759.08) or moreContract budget = (construction cost + overheads + profit) × (1 + VAT), per the INSST guide
b) Duration and workforceMore than 30 working days and, at some point, more than 20 workers at onceBoth conditions together, on the planned programme
c) Labour volumeMore than 500 working days summed across all workersWorkers × days for each phase, added up. One day is an 8-hour shift
d) Type of workTunnels, galleries, underground conduits and damsAlways, whatever the budget

It is easy to go wrong on the first condition: comparing the bare construction cost with the threshold. The decree refers to the contract execution budget. The INSST guide makes clear it includes VAT. A job under €450,000 in construction cost can clear the threshold comfortably once overheads, profit and VAT are added.

The guide adds a recommendation: the project should state the budget, the duration and the labour volume. When the basic study is chosen, it should justify with those figures why the full one does not apply. It also notes that the client can commission the full study even where the basic one would do, if the job calls for it.

Two worked examples

We take overheads of 13% and contractor’s profit of 6%, common figures that each project sets. VAT is 21% for simplicity: the applicable rate depends on the job and is worth checking.

JobConstruction costContract budgetEstimated labourStudy
Full refurbishment of a flat€120,000120,000 × 1.19 × 1.21 = €172,7883 workers × 20 days + 5 × 40 + 4 × 30 = 380 daysBasic: no condition is met
Six-flat building€400,000400,000 × 1.19 × 1.21 = €575,960No need to work it outFull: above the budget threshold

In the second case the construction cost is below €450,759.08. That is why a basic study can easily slip in where the full one was due. In the first, a labour-heavy refurbishment with a long programme can approach 500 days even on a modest budget: it is worth adding it up phase by phase and putting the sum in writing.

What the basic study must contain

Articles 6.2 and 6.3 set the content of the basic study, which is much shorter than the full one (article 5.2). Comparing them makes clear what can be left out and what cannot:

ContentFull studyBasic study
Health and safety rules applicable to the jobYesYes
Avoidable risks and the technical measures to avoid themYes, in the reportYes
Risks that cannot be removed, with preventive measures, protection and an assessment of how well they workYes, in the reportYes
Specific measures for Annex II workYes, with the areas locatedYes, where relevant
Provisions for later workYesYes
Procedures, equipment and site plant. Welfare facilitiesYesNot required
Specifications, drawings, measurements and budgetYes, with the budget as a chapter of the main oneNot required

The INSST guide describes the basic study as a purely descriptive document. It asks for enough detail that the contractor can write its plan from it. It accepts added drawings where they help. A generic list of risks from any job does not do that: the basic study has to talk about this job, its access, its surroundings, its structure and the phases it will actually have.

Special risks and later work

Two sections of the basic study are often dispatched with a stock phrase. They are the ones that say most about the job. The first is Annex II work, a non-exhaustive list of work with special risks. In building work these come up most:

  • Especially serious risks of burial, collapse or falls from height: excavations, roofs, façades, slabs being demolished.
  • Exposure to especially serious chemical or biological agents: in a refurbishment, typically asbestos cement, which has its own rules as well.
  • Work near high-voltage power lines.
  • Assembly or dismantling of heavy prefabricated elements.

The second is the provision for later work (article 6.3): how the façade will be cleaned, the roof inspected or the services maintained safely. If the project leaves a roof with no access or anchor points, the study has to say so. Making sure the report and the basic study describe the same job is part of the cross-check covered in what a project report must contain.

Who signs it and what comes next

It is written by the competent professional the client appoints. Where several designers are involved, the client must appoint a health and safety coordinator for the design stage, who writes it or has it written (articles 3.1 and 6.1). The rest of the path is as follows:

  • Project: the study is part of the construction project. Including it is a condition for certification by the professional body and for the permit (article 17). Annex I of the building code lists it among the report’s annexes without an asterisk: it is not among the minimum contents of the basic project. So if the permit is applied for with the basic project, that project need not include it. Some councils ask for it with the application, so check their list. Either way, work cannot start without the construction project and its study.
  • Plan: each contractor develops it into its own health and safety plan according to how it will carry out the work, without lowering the levels of protection (article 7.1).
  • Approval: the construction-stage coordinator approves the plan before work starts. Where no coordinator is needed, because a single firm works on site with no self-employed workers, the site supervision team takes this on (article 7.2).
  • Opening: the contractor notifies the labour authority of the opening of the site before work starts, with the plan attached (article 19). The client’s old prior notice was repealed in 2010.
  • Incident book: supplied by the professional body of whoever approves the plan and kept on site at all times (article 13).

How this annex fits with the rest of the application is covered in documents for a building permit application.

Before you submit it

A pass over the study and the documents it is checked against:

  • The project states the contract budget, the programme and the labour volume. It uses them to justify that the basic study is enough.
  • The threshold has been compared with the contract execution budget, VAT included, not with the bare construction cost.
  • Job name, site, client and phases match the report and the programme.
  • The risks and measures belong to this job: its access, surroundings, structure and demolitions.
  • Any Annex II work is identified with its specific measures.
  • If the report or the waste study mention asbestos, so does the basic study.
  • There are provisions for later work on the roof, façade and services.
  • Where several designers are involved, the design-stage coordinator is named.

If it comes from a template, it is worth searching the text for any trace of the previous job: a tower crane in a flat refurbishment or a basement that does not exist gives the study away on first reading.

Where Archelo helps

Archelo recognises the health and safety study among the application’s documents, even when it sits inside the same PDF as the project. It warns when it is missing for the stage and type of work. It does not decide whether a basic study is enough, nor write it: each job’s budget, programme and risks are known by whoever designs it. You can see how it works on AI for architects.

This article is for information only and does not replace checking the current text of Royal Decree 1627/1997 and the rules that complement it, nor what the professional body and the council require for each job.

Keep reading

10 · 3 · 1The years of liability for structure, habitability and finishes, counted from handover.LOE, art. 17.1

The Building Act in a practice: who answers for what and from when

Each party answers for its own part for ten, three or one year depending on the defect. Every period runs from handover, so a badly closed handover record moves the clock and leaves parts uncovered.

Ground floor plus one, seven to twelve dwellings upstairsThe decree requires the lift installed. The building code settles for leaving room for one.

Accessibility in Andalusia: Decree 293/2009 in housing projects

In a residential building, Decree 293/2009 governs communal areas and reserved dwellings, not the inside of the others. It applies alongside DB-SUA. Where the two differ, the stricter one must be met.

Art. 299.2Other authorities’ approvals come before the permit. A permit cannot be conditional on obtaining them later.LISTA Regulations

How to organise a project application before you submit it

A well-organised application prevents a missing document, an invalid signature or two figures that disagree. The council’s own list is the one that counts. Documents are sorted by when they go in: with the application, before work starts or at completion. Before signing, the same figure has to read the same in every document.

Four jobs that must be certified
  • Execution project
  • Final certificate
  • Legalisation
  • Demolition without explosives

Visado: when certification by the professional body is mandatory

Certification by the professional body is voluntary except for a closed list of work. In building, the list includes the execution project and the final certificate. The basic design is not on it and a permit can be applied for with it.

AI for architects: can it check a project against building regulations?

Software can already verify much of what a project has to state, with the article and page of every figure. What it cannot do is decide what your project means. And nothing failing does not mean it complies.

Seven minimum contents
  • Estimate and prevention
  • Destination and separation
  • Drawings and specifications
  • Cost

The construction waste management study (RD 105/2008): what it must include

RD 105/2008 requires the waste management study and the designer writes it. It has seven minimum contents and five of them already go in the basic design. A refurbishment adds an inventory of hazardous waste.

1.50 mThe height that most often makes usable area differ from one document to another.

The usable and gross floor area schedule: the most common mistakes

The usable area in a valuation, the one on the energy certificate and the cadastre’s gross area are not measured the same way. Countable area is set by each municipality. That is why a schedule has to say which criterion it uses.

ChatGPT for architects: what it is good for, where it fails with regulations and how to check it

ChatGPT and the other general assistants draft, summarise and explain well. They are not a source of regulations: use them for the former and never accept a requirement without opening the official text.

Documents for a building permit application in Spain: the complete file, in order and reviewed

A permit application with a project brings together five groups of documents. Each council publishes its own list, though the core is common across Spain. Before submitting, the most useful check is that they all say the same.

Art. 138What goes by self-declaration in Andalusia. Everything else needs a permit.LISTA

Self-declaration or building permit in Andalusia: when each applies

In Andalusia the permit is the rule and the self-declaration the exception listed in article 138 of the LISTA. Needing a project does not mean needing a permit: a refurbishment with a project on urban land can go by self-declaration if it leaves occupancy, height, buildable area and number of dwellings unchanged.

DB-SUA in housing: stairs, guarding and changes of level

The stair in a duplex and the communal stair are not justified with the same figures. Their balustrades are: the conditions against climbing and openings are the same throughout the building.

Refurbishment or maintenance?The first thing that decides which part of DB-SI must be justified.

DB-SI in a dwelling refurbishment: what to justify and what not

In a refurbishment DB-SI neither applies in full nor stops applying. It reaches what the work alters, escape routes if occupancy changes and protection systems if what carries them is touched. Existing safety can never be made worse.

50 l/sThe minimum extraction over the hob, with its own duct.CTE DB-HS 3

DB-HS 3: how to justify a dwelling’s ventilation rates

Table 2.1 gives the flows and the justification does not end there. Supply and extract must be balanced, openings and ducts sized and the kitchen solved. A two-bedroom flat shows how.

What a project report must contain under Spain’s building code and how to review it before submission

The report is where a project is justified. Spain’s building code sets its minimum content. What must be written depends on the work, the use, the stage and the council.

Is it allowed? Does it comply? Does the building permit it?The three questions of a shop-to-dwelling change, in order.

Retail to residential: what to check before applying for the permit

Changing a shop’s use is work that needs a project, however small it looks. The first question is not the building code but the plan: if housing is not allowed on that floor and that street, no project will do.

How to use AI in an architecture practice: from brief to permit

When people talk about AI for architects they almost always mean images. But a project is a long chain, from brief to permit. Each stage has work you can delegate and work you cannot.

40% · 20%The national minimum reserve: on rural land being urbanised, and on urbanised land under renewal.TRLSRU, art. 20.1.b

Affordable housing reserve: what to check before fixing the percentage

The national Land Act sets a minimum of 40% or 20% depending on the development. Regional law, the current plan and transitional provisions can change that figure on each site.

Pilot programme

Try Archelo on a real case.

Archelo helps you prepare all your project documents, analyses the drawings, tells you whether it complies before you submit and keeps everything organised. Want to try it?

Watch the demo

Request access

Try Archelo on your own projects. Fill in the form and we will email you as soon as your access is ready.

We use these details only to give you access.