AI for architects: can it check a project against building regulations?

Software can already verify much of what a project has to state, with the article and page of every figure. What it cannot do is decide what your project means. And nothing failing does not mean it complies.

In this article
  1. The short version
  2. What checking a requirement actually means
  3. What software can already check well
  4. What depends on what you give it
  5. What it cannot do
  6. The trap: nothing failing is not the same as complying
  7. How to judge a compliance tool
  8. Where Archelo fits
  9. Frequently asked questions

The short version

In part, yes. Software can already verify much of what a project has to state: that an area is the same in the report and on the drawings, that the rooms meet the minimum programme, that a required document or section is there, that the cost in the report is the one in the BC3 file. What it cannot do is decide what your project means, guess a reading the council has never written down or answer for the project.

The useful question is not whether a tool “checks compliance” but which checks it runs, against which text and what it tells you it could not verify.

What checking a requirement actually means

A complete check has four parts. It only counts when all four are written down:

  • The requirement. The figure or condition to be met.
  • Its source. The regulation, the section and the version in force.
  • Its condition of application. The use, the kind of works, the scope and the exceptions.
  • The project figure. The value that meets it, with the document and page it comes from.

A general assistant tends to give the first part. A check needs all four.

What software can already check well

CheckWhat it needsExample
Consistency between documentsThe report, the drawings and the estimateThe same room at 10.48 m² in the report and 10.18 m² on the drawings.
Measurable requirementsAn area schedule, drawings with layers or a modelA main bedroom below the minimum area set by the local plan.
Required contentThe documents in the fileThe waste management study or a section of the report required by Annex I of Part I of the building code is missing.
Figures that must matchThe report and the estimateThe construction cost in the report is not the one in the BC3 file.
CitationsThe official text of the ruleEvery finding with its article and the project page.

These checks share two things: the requirement is explicit and the figure can be read from the documents. That is where software is faster and more patient than anyone in the practice, especially across a file of several hundred pages.

What depends on what you give it

Drawings it can measure

A PDF without layers does not separate walls, dimensions or rooms. What is written on it can be read, such as an area schedule. Measuring the drawing is far less reliable. A DXF with layers or an IFC model does give the rooms and their areas. A good tool tells you which of the two it has in front of it.

The local rules, in their official text

The building code is national. The local plan, the bylaws and the heritage catalogues change from one town to the next. A tool can only check the rules it has and it must say which ones it lacks.

The project’s context

A refurbishment and a change of use are not checked the same way: the building code applies to work on existing buildings on the terms of its Part I (article 2.3). The use, the kind of works, the stage and the location change what is required. If any of them is missing, the tool should ask rather than assume.

What it cannot do

  • Judge the design. Whether the solution is good architecture is not a check.
  • Validate an alternative solution. Part I of the building code (article 5.1.3) allows a departure from the basic documents if equivalent performance is justified. That justification is professional judgement, not a lookup.
  • Know the unwritten reading. How a council reads an ambiguous bylaw is learnt by submitting, not from a text.
  • See what is not in the documents. The real state of the building, the site, what was agreed with the client.
  • Answer for the project. The designer drafts the project “subject to the corresponding technical and planning regulations” (LOE, article 10.1). Part I of the building code places its application on the agents of the building process (article 5.1.1). Software is a tool.

The trap: nothing failing is not the same as complying

A list of checks has three states, not two: passes, fails and could not be checked. The last happens when a figure is missing, the rule is not available or the drawing cannot be measured. A summary that says “no breaches” while points are still open is not telling the truth: what is pending may still fail.

A serious tool gives the count of what it checked and what is pending. It never turns the absence of a failure into a pass.

How to judge a compliance tool

  • Does every finding cite the regulation, the section and the version, taken from the official text?
  • Does it show the project figure and the page it was read from?
  • Does it say what it could not check and why?
  • Does it ask for what is missing instead of assuming it?
  • Does it work with your files as they are: PDF, Word, DXF, IFC and BC3?
  • Where are your projects stored and who can see them?

Where Archelo fits

It is built around this way of checking. It reviews the whole file with explicit checks against the official text of the rules it covers. It cites the article and the page of every finding and keeps apart what passes, what fails and what is still to justify. When a question calls for reasoning, it answers like an architect and says where each figure comes from. More on AI for architects.

This article is for information and does not replace the regulations in force in each town.

Frequently asked questions

Can AI check a project against the building code?

In part: it can verify explicit, measurable requirements and the consistency between documents, citing the article and the page. It cannot judge the design, validate an alternative solution or know the council’s unwritten reading. Nor does it answer for the project.

Can AI measure areas from drawings?

From a DXF with layers or an IFC model, yes. From a PDF without layers it reliably reads what is written on it, such as the area schedule. Measuring the drawing is far less reliable. A good tool says so.

If the review finds no breaches, does the project comply?

Not necessarily. It means nothing that was checked failed. What could not be checked must appear on the list. The architect reviews it before signing.

Who is responsible if an automated check is wrong?

The architect who signs. Under the LOE (article 10) the designer drafts the project subject to the regulations. The software is a tool.

Keep reading

10 · 3 · 1The years of liability for structure, habitability and finishes, counted from handover.LOE, art. 17.1

The Building Act in a practice: who answers for what and from when

Each party answers for its own part for ten, three or one year depending on the defect. Every period runs from handover, so a badly closed handover record moves the clock and leaves parts uncovered.

Ground floor plus one, seven to twelve dwellings upstairsThe decree requires the lift installed. The building code settles for leaving room for one.

Accessibility in Andalusia: Decree 293/2009 in housing projects

In a residential building, Decree 293/2009 governs communal areas and reserved dwellings, not the inside of the others. It applies alongside DB-SUA. Where the two differ, the stricter one must be met.

Art. 299.2Other authorities’ approvals come before the permit. A permit cannot be conditional on obtaining them later.LISTA Regulations

How to organise a project application before you submit it

A well-organised application prevents a missing document, an invalid signature or two figures that disagree. The council’s own list is the one that counts. Documents are sorted by when they go in: with the application, before work starts or at completion. Before signing, the same figure has to read the same in every document.

Four jobs that must be certified
  • Execution project
  • Final certificate
  • Legalisation
  • Demolition without explosives

Visado: when certification by the professional body is mandatory

Certification by the professional body is voluntary except for a closed list of work. In building, the list includes the execution project and the final certificate. The basic design is not on it and a permit can be applied for with it.

€450,759.08The contract price, with VAT, from which the study must be the full one.RD 1627/1997, art. 4.1

The basic health and safety study (RD 1627/1997): when it is enough and what it contains

Every project-based job carries a health and safety study, full or basic. Four conditions decide which. The cost threshold is measured on the contract budget with VAT, not on the material execution budget.

Seven minimum contents
  • Estimate and prevention
  • Destination and separation
  • Drawings and specifications
  • Cost

The construction waste management study (RD 105/2008): what it must include

RD 105/2008 requires the waste management study and the designer writes it. It has seven minimum contents and five of them already go in the basic design. A refurbishment adds an inventory of hazardous waste.

1.50 mThe height that most often makes usable area differ from one document to another.

The usable and gross floor area schedule: the most common mistakes

The usable area in a valuation, the one on the energy certificate and the cadastre’s gross area are not measured the same way. Countable area is set by each municipality. That is why a schedule has to say which criterion it uses.

ChatGPT for architects: what it is good for, where it fails with regulations and how to check it

ChatGPT and the other general assistants draft, summarise and explain well. They are not a source of regulations: use them for the former and never accept a requirement without opening the official text.

Documents for a building permit application in Spain: the complete file, in order and reviewed

A permit application with a project brings together five groups of documents. Each council publishes its own list, though the core is common across Spain. Before submitting, the most useful check is that they all say the same.

Art. 138What goes by self-declaration in Andalusia. Everything else needs a permit.LISTA

Self-declaration or building permit in Andalusia: when each applies

In Andalusia the permit is the rule and the self-declaration the exception listed in article 138 of the LISTA. Needing a project does not mean needing a permit: a refurbishment with a project on urban land can go by self-declaration if it leaves occupancy, height, buildable area and number of dwellings unchanged.

DB-SUA in housing: stairs, guarding and changes of level

The stair in a duplex and the communal stair are not justified with the same figures. Their balustrades are: the conditions against climbing and openings are the same throughout the building.

Refurbishment or maintenance?The first thing that decides which part of DB-SI must be justified.

DB-SI in a dwelling refurbishment: what to justify and what not

In a refurbishment DB-SI neither applies in full nor stops applying. It reaches what the work alters, escape routes if occupancy changes and protection systems if what carries them is touched. Existing safety can never be made worse.

50 l/sThe minimum extraction over the hob, with its own duct.CTE DB-HS 3

DB-HS 3: how to justify a dwelling’s ventilation rates

Table 2.1 gives the flows and the justification does not end there. Supply and extract must be balanced, openings and ducts sized and the kitchen solved. A two-bedroom flat shows how.

What a project report must contain under Spain’s building code and how to review it before submission

The report is where a project is justified. Spain’s building code sets its minimum content. What must be written depends on the work, the use, the stage and the council.

Is it allowed? Does it comply? Does the building permit it?The three questions of a shop-to-dwelling change, in order.

Retail to residential: what to check before applying for the permit

Changing a shop’s use is work that needs a project, however small it looks. The first question is not the building code but the plan: if housing is not allowed on that floor and that street, no project will do.

How to use AI in an architecture practice: from brief to permit

When people talk about AI for architects they almost always mean images. But a project is a long chain, from brief to permit. Each stage has work you can delegate and work you cannot.

40% · 20%The national minimum reserve: on rural land being urbanised, and on urbanised land under renewal.TRLSRU, art. 20.1.b

Affordable housing reserve: what to check before fixing the percentage

The national Land Act sets a minimum of 40% or 20% depending on the development. Regional law, the current plan and transitional provisions can change that figure on each site.

Pilot programme

Try Archelo on a real case.

Archelo helps you prepare all your project documents, analyses the drawings, tells you whether it complies before you submit and keeps everything organised. Want to try it?

Watch the demo

Request access

Try Archelo on your own projects. Fill in the form and we will email you as soon as your access is ready.

We use these details only to give you access.