AI for architects: can it check a project against building regulations?
Software can already verify much of what a project has to state, with the article and page of every figure. What it cannot do is decide what your project means. And nothing failing does not mean it complies.

In this article
The short version
In part, yes. Software can already verify much of what a project has to state: that an area is the same in the report and on the drawings, that the rooms meet the minimum programme, that a required document or section is there, that the cost in the report is the one in the BC3 file. What it cannot do is decide what your project means, guess a reading the council has never written down or answer for the project.
The useful question is not whether a tool “checks compliance” but which checks it runs, against which text and what it tells you it could not verify.
What checking a requirement actually means
A complete check has four parts. It only counts when all four are written down:
- The requirement. The figure or condition to be met.
- Its source. The regulation, the section and the version in force.
- Its condition of application. The use, the kind of works, the scope and the exceptions.
- The project figure. The value that meets it, with the document and page it comes from.
A general assistant tends to give the first part. A check needs all four.
What software can already check well
| Check | What it needs | Example |
|---|---|---|
| Consistency between documents | The report, the drawings and the estimate | The same room at 10.48 m² in the report and 10.18 m² on the drawings. |
| Measurable requirements | An area schedule, drawings with layers or a model | A main bedroom below the minimum area set by the local plan. |
| Required content | The documents in the file | The waste management study or a section of the report required by Annex I of Part I of the building code is missing. |
| Figures that must match | The report and the estimate | The construction cost in the report is not the one in the BC3 file. |
| Citations | The official text of the rule | Every finding with its article and the project page. |
These checks share two things: the requirement is explicit and the figure can be read from the documents. That is where software is faster and more patient than anyone in the practice, especially across a file of several hundred pages.
What depends on what you give it
Drawings it can measure
A PDF without layers does not separate walls, dimensions or rooms. What is written on it can be read, such as an area schedule. Measuring the drawing is far less reliable. A DXF with layers or an IFC model does give the rooms and their areas. A good tool tells you which of the two it has in front of it.
The local rules, in their official text
The building code is national. The local plan, the bylaws and the heritage catalogues change from one town to the next. A tool can only check the rules it has and it must say which ones it lacks.
The project’s context
A refurbishment and a change of use are not checked the same way: the building code applies to work on existing buildings on the terms of its Part I (article 2.3). The use, the kind of works, the stage and the location change what is required. If any of them is missing, the tool should ask rather than assume.
What it cannot do
- Judge the design. Whether the solution is good architecture is not a check.
- Validate an alternative solution. Part I of the building code (article 5.1.3) allows a departure from the basic documents if equivalent performance is justified. That justification is professional judgement, not a lookup.
- Know the unwritten reading. How a council reads an ambiguous bylaw is learnt by submitting, not from a text.
- See what is not in the documents. The real state of the building, the site, what was agreed with the client.
- Answer for the project. The designer drafts the project “subject to the corresponding technical and planning regulations” (LOE, article 10.1). Part I of the building code places its application on the agents of the building process (article 5.1.1). Software is a tool.
The trap: nothing failing is not the same as complying
A list of checks has three states, not two: passes, fails and could not be checked. The last happens when a figure is missing, the rule is not available or the drawing cannot be measured. A summary that says “no breaches” while points are still open is not telling the truth: what is pending may still fail.
A serious tool gives the count of what it checked and what is pending. It never turns the absence of a failure into a pass.
How to judge a compliance tool
- Does every finding cite the regulation, the section and the version, taken from the official text?
- Does it show the project figure and the page it was read from?
- Does it say what it could not check and why?
- Does it ask for what is missing instead of assuming it?
- Does it work with your files as they are: PDF, Word, DXF, IFC and BC3?
- Where are your projects stored and who can see them?
Where Archelo fits
It is built around this way of checking. It reviews the whole file with explicit checks against the official text of the rules it covers. It cites the article and the page of every finding and keeps apart what passes, what fails and what is still to justify. When a question calls for reasoning, it answers like an architect and says where each figure comes from. More on AI for architects.
This article is for information and does not replace the regulations in force in each town.
Frequently asked questions
Can AI check a project against the building code?
In part: it can verify explicit, measurable requirements and the consistency between documents, citing the article and the page. It cannot judge the design, validate an alternative solution or know the council’s unwritten reading. Nor does it answer for the project.
Can AI measure areas from drawings?
From a DXF with layers or an IFC model, yes. From a PDF without layers it reliably reads what is written on it, such as the area schedule. Measuring the drawing is far less reliable. A good tool says so.
If the review finds no breaches, does the project comply?
Not necessarily. It means nothing that was checked failed. What could not be checked must appear on the list. The architect reviews it before signing.
Who is responsible if an automated check is wrong?
The architect who signs. Under the LOE (article 10) the designer drafts the project subject to the regulations. The software is a tool.
















